El Tina Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
El Tina Gas Pipeline خط غاز التينة, خط غاز التينة غرب- ميت نما is an under construction gas pipeline in Egypt.[1]
Location
El Tina Gas Pipeline is a proposed gas pipeline in Egypt that starts in El Tina, Port Said, Egypt and ends in Mit Nema in Al Qalyubia Governorate, Egypt.[1][2]
Project details
- Operator: Egyptian Natural Gas Holding company[1]
- Owner: Egyptian Natural Gas Holding company[2]
- Parent Company: Egyptian Natural Gas Holding company
- Length: 170 kilometers[1]
- Diameter: 42 inches[1]
- Status: Construction [3]
- Start year: 2023[1]
- Cost: EGP 2.318 billion[1]
- Financing:
- Associated infrastructure:
Background
El Tina Gas Pipeline was proposed in 2019, and construction began in 2020. It is expected to be operational in 2023.[3][2]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "مشروعات الشبكة القومية للغازات الطبيعية" (PDF).
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 (PDF) https://www.elwatannews.com/data/iframe/pdf/345224543534.pdf.
{{cite web}}
: Missing or empty|title=
(help)CS1 maint: url-status (link) - ↑ 3.0 3.1 الوطن (2022-01-11). "البترول تقرر مد العمل في مشروع خط غاز ميت نما لمدة 18 شهرا". الوطن (in العربية). Retrieved 2022-07-13.
Related GEM.wiki articles
External resources
External articles
*add as many countries as the pipeline passes through