El Tina Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

El Tina Gas Pipeline خط غاز التينة, خط غاز التينة غرب- ميت نما is an under construction gas pipeline in Egypt.[1]

Location

El Tina Gas Pipeline is a proposed gas pipeline in Egypt that starts in El Tina, Port Said, Egypt and ends in Mit Nema in Al Qalyubia Governorate, Egypt.[1][2]

Loading map...

Project details

  • Operator: Egyptian Natural Gas Holding company[1]
  • Owner: Egyptian Natural Gas Holding company[2]
  • Parent Company: Egyptian Natural Gas Holding company
  • Length: 170 kilometers[1]
  • Diameter: 42 inches[1]
  • Status: Construction [3]
  • Start year: 2023[1]
  • Cost: EGP 2.318 billion[1]
  • Financing:
  • Associated infrastructure:

Background

El Tina Gas Pipeline was proposed in 2019, and construction began in 2020. It is expected to be operational in 2023.[3][2]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "مشروعات الشبكة القومية للغازات الطبيعية" (PDF).{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 (PDF) https://www.elwatannews.com/data/iframe/pdf/345224543534.pdf. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)
  3. 3.0 3.1 الوطن (2022-01-11). "البترول تقرر مد العمل في مشروع خط غاز ميت نما لمدة 18 شهرا". الوطن (in العربية). Retrieved 2022-07-13.

Related GEM.wiki articles

External resources

External articles

*add as many countries as the pipeline passes through