El Wasta–Beni Suef Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
El Wasta–Beni Suef Gas Pipeline, خط غاز الواسطي - بني سويف, is an operating gas pipeline in Egypt.[1]
Location
Project details
- Operator:
- Owner: Egyptian Natural Gas Holding Company [100%][2]
- Parent company: Egyptian Natural Gas Holding Company [100%][2]
- Capacity:
- Length: 65 km[1]
- Diameter: 36 in[1]
- Status: Operating[2]
- Start year: 2019[2]
- Cost: 555 million EGP[2]
- Financing:
- Associated infrastructure: Beni Suef power plant
Background
THe project was built to provide gas to the Beni Suef power plant.[2]
Articles and resources
References
- ↑ 1.0 1.1 1.2 "https://documents1.worldbank.org/curated/en/268521499677199123/pdf/SFG1795-V2-EA-P116194-PUBLIC-Disclosed-7-10-2017.pdf" (PDF). Retrieved 2022-09-15.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|title=
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 Egypt's Projects Map. "المرحلة الأولي لخط تدعيم الواسطي - بني سويف". egy-map.com. Retrieved 2022-09-15.