Eland 1 Solar & Storage Center

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Eland 1 Solar & Storage Center is an operating solar photovoltaic (PV) farm in Mojave, Kern County, California, United States.

Project Details

Table 1: Phase-level project details for Eland 1 Solar & Storage Center

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2024[2] 200 MWac[3] PV[3] Arevon Energy, Inc.[4] Avantus[5]
2 Pre-construction[3] 2025 (planned)[6] 200 MWac[3] PV[3] Arevon Energy, Inc.[4] Avantus[5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Eland 1 Solar & Storage Center

Phase Name Location Coordinates (WGS 84)
1 Mojave, Kern County, California, United States[3] 35.2237, -117.9770 (exact)[3]
2 Mojave, Kern County, California, United States[3] 35.2167, -117.9770 (exact)[3]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860m/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  4. 4.0 4.1 https://arevonenergy.com/arevon-reaches-financial-close-for-eland-1-solar-plus-storage-power-plant/. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://www.prnewswire.com/news-releases/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar--storage-center-300990780.html https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/, https://www.prnewswire.com/news-releases/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar--storage-center-300990780.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. https://arevonenergy.com/news/releases/arevon-announces-the-start-of-commercial-operations-at-its-eland-1-solar-plus-storage-project-in-california/ https://www.eia.gov/electricity/data/eia860/, https://arevonenergy.com/news/releases/arevon-announces-the-start-of-commercial-operations-at-its-eland-1-solar-plus-storage-project-in-california/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)