Elenga-Tarakandi Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Elenga-Tarakandi Gas Pipeline is a gas pipeline in Bangladesh.[1]
Location
The pipeline runs from Elenga, Tangail District, to the fertilizer factory in Tarakandi, Dhaka District, Bangladesh.[2]
Project Details
- Operator: Titas Gas Transmission and Distribution Company (TGTDCL)[3]
- Owner: Titas Gas Transmission and Distribution Company (TGTDCL)[3]
- Parent company: Petrobangla[3]
- Capacity: 80 million cubic feet per day[3]
- Length: 26 mi / 42 km[3]
- Diameter: 12 inches[3]
- Status: Operating[4]
- Start year: 1991
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline is operated by Titas Gas, a subsidiary of Petrobangla.[1]
Articles and resources
References
- ↑ 1.0 1.1 Annual Report, Petrobangla, 2016
- ↑ PIPELINING-WORLDWIDE CONSTRUCTION, Oil & Gas Journal, Oct. 15, 1990
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Annual Report 2020" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Annual Report 2021" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link)