Elkview Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Elkview Coal Mine is an operating coal mine in Sparwood, British Columbia, Canada.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Elkview Coal Mine | Sparwood, British Columbia, Canada[1][2] | 49.742507, -114.823906 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating[2] | – | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
9[3] | 5.2[4] | 2022[4] | Surface[3] | Open Pit[3] | 124[3] | 60* | 920[5] |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
258.5[3] | – | 678.8[3] | – | Bituminous | Met[2] | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Teck Coal Partnership[2][3] | Teck Resources Ltd [100.0%] | Canada, Japan, South Korea |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM[6] | 6[6] | 6[6] | 7[6] | 6[7] | 9[8] | 5[9] | 5[10] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background
Elkview Mine is a surface coal mine, operated by Teck Coal near Sparwood, British Columbia, Canada. Teck has a 95% partnership interest in the Elkview mine. The remaining 5% is held equally by Nippon Steel Corporation and POSCO, a Korean steel producer, each of which acquired a 2.5% interest in 2005 for US$25 million. The mine is 27,054 hectares of coal lands of which 3,599 hectares have been mined or are scheduled for mining. Elkview is primarily steelmaking coal, and a small amount of thermal coal. The annual production capacities of the mine and preparation plan are approximately 5.6 million and 6.5 milllion tons. At 2010 production rates, the Elkview mine is estimated to have a remaining reserve life of approximately 41 years.[11]
- Operator: Teck Coal
- Owner: Teck Coal (95%), Nippon Steel (2.5%), POSCO (2.5%)[12]
- Location: Sparwood, British Columbia, Canada
- GPS Coordinates:49.742507, -114.823906 (exact)
- Mine Status: Operating
- Start Year:
- Production: 7.9 million tonnes[13]
- Mineable Reserves:
- Coal Type: Met, bituminous
- Mine Size:
- Mine Type: Surface
- Number of Employees: 920
Environmental Impacts
According to the Environmental Justice (EJ) Atlas, over the past two decades, scientists and citizens have been alerting to the fact that populations of fish, invertebrates and other marine animals in the area have been decreasing while the remaining populations have been displaying increasing deformities.
These phenomena are due to the high presence of selenium in the waterways of the valley, a substance which is necessary to human health in small doses but becomes toxic in high doses, and which is detrimental and potentially lethal to other non-human animals including fish.
The selenium comes from the Elk Valley Mines, which extract metallurgical coal necessary for the manufacturing of steel by applying a “cross-valley fill” technique. The rock is first scraped from the surface of the mountainside after which the coal is separated from the rest of the material, which becomes waste. The waste material, which contains the selenium deposits, is left in piles and, through exposure to air and water, slowly seeps selenium into groundwater, eventually reaching river bodies.[14][15]
Mine Expansion
In April 2020, Teck completed its Elkview Operations Plant Expansion Project. The expansion gave Elkview the capacity to produce nine million tonnes annually. It also allowed Teck to replace higher cost production from its Cardinal River operations (which closed in the second half of 2020) with lower cost production from its Elkview operations.[16]
Proven and probable reserves at Elkview are now projected to support mining for a further 30 years, extending the life of the mine to 2047.[11][17]
Project Expansion Details
- Status: Operating
- Capacity: 9 million tons per annum
- Mineable Reserves:
- Start Year: 2020
- Source of Financing:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20240121032219/https://www.teck.com/media/2021-2022-Elk-Valley-Access-Maps.pdf. Archived from the original (PDF) on 21 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://www.teck.com/operations/canada/operations/elkview/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 (PDF) https://web.archive.org/web/20240125054415/https://www.teck.com/media/2023-AIF.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 (PDF) https://www2.gov.bc.ca/assets/gov/farming-natural-resources-and-industry/mineral-exploration-mining/documents/reports/annual_report_of_the_chief_inspector_of_mines_2022-2023.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240328172633/https://elkvalleycoal.com/elkview-coal-mine-celebrates-a-milestone/. Archived from the original on 28 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://minfile.gov.bc.ca/report.aspx?f=PDF&r=Production_Detail.rpt&minfilno=082GNE017.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://cmscontent.nrs.gov.bc.ca/geoscience/publicationcatalogue/InformationCircular/BCGS_IC2021-02.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://cmscontent.nrs.gov.bc.ca/geoscience/PublicationCatalogue/InformationCircular/BCGS_IC2022-01.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://cmscontent.nrs.gov.bc.ca/geoscience/PublicationCatalogue/InformationCircular/BCGS_IC2023-01.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://cmscontent.nrs.gov.bc.ca/geoscience/PublicationCatalogue/InformationCircular/BCGS_IC2024-01.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 "Operations: Elkview", Teck Coal website, accessed June 21, 2022.
- ↑ Annual Information Form, February 23, 2022.
- ↑ Canada: Five Largest Surface Coal Mines in 2021, accessed December 2022
- ↑ C. Linnitt, For decades B.C. failed to address selenium pollution in the Elk Valley. Now no one knows how to stop it,The Narwhal, December 4, 2018
- ↑ C. Williams,From Canadian Coal Mines, Toxic Pollution That Knows No Borders, YaleEnvironment360, April 1, 2019.
- ↑ Q2 2020 Financial Report, Teck Resources Limited, accessed June 21, 2022.
- ↑ "Teck proposed expansions", Elk Valley Coal News, accessed June 21, 2022.