Enugu (Motir Dusable Limited) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Enugu (Motir Dusable Limited) solar farm is a shelved solar photovoltaic (PV) farm in Enugu State, Nigeria.

Project Details

Table 1: Phase-level project details for Enugu (Motir Dusable Limited) solar farm

Phase name Status Nameplate capacity Technology Owner
1 Shelved[1] 100 MW[2] PV[3] Motir DuSable LTD [100%][4]
2 Cancelled (inferred November 2022) 200 MW[5] PV[3] Motir DuSable LTD [100%][5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Enugu (Motir Dusable Limited) solar farm

Phase Name Location Coordinates (WGS 84)
1 Enugu State, Nigeria[2] 6.4721, 7.4398 (approximate)[2]
2 Enugu State, Nigeria[5] 6.4721, 7.4398 (approximate)[5]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240201091529/https://www.thisdaylive.com/index.php/2022/04/25/six-years-after-signing-1125mw-power-purchase-deals-14-firms-fail-to-get-funding. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240201091300/https://www.greenclimate.fund/sites/default/files/document/funding-proposal-fp104-afc-nigeria.pdf. Archived from the original (PDF) on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240207103524/https://www.greenbuildingafrica.co.za/nigeria-wants-to-renegotiate-tariffs-on-14-ipp-solar-pv-projects/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20240207142040/https://thenicheng.com/nigerians-paying-40m-monthly-for-electricity-not-supplied/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240201091407/https://constructionreviewonline.com/news/nigeria/us-based-renewable-energy-firm-to-develop-300mw-solar-plant-in-nigeria/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)