Esmeralda (NextEra) Solar Energy Center Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Esmeralda (NextEra) Solar Energy Center Project is a solar photovoltaic (PV) farm in pre-construction in Esmeralda County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Esmeralda (NextEra) Solar Energy Center Project
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Pre-construction[1] | 2025 (planned)[1] | 500 MW[2] | PV[2] | NextEra Energy Inc [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Esmeralda (NextEra) Solar Energy Center Project
Location | Coordinates (WGS 84) |
---|---|
Esmeralda County, Nevada, United States[2] | 37.8067, -117.6420 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "New & Proposed Generation Plants in Nevada". State of Nevada Public Utilities Commission. Archived from the original on 2024-02-01.
- ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240201183706/https://www.blm.gov/press-release/blm-host-virtual-public-meetings-proposed-solar-projects-near-esmeralda-substation. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)