Estevan geothermal power plant is a geothermal power plant in pre-construction in Estevan, Saskatchewan, Canada.

Project Details

Table 1: Unit-level project details for Estevan geothermal power plant

Unit name Status Commissioning year Nameplate capacity Technology Owner Operator
1, Rafferty Pre-construction[1] 2025[2] 25 MW[1] Binary cycle[3] DEEP Earth Energy Production Corp. (DEEP) [100%][4] DEEP Earth Energy Production Corp. (DEEP)[5]
2 Announced[5] 20 MW[1] Unknown type DEEP Earth Energy Production Corp. (DEEP) [100%][4] DEEP Earth Energy Production Corp. (DEEP)[5]
3 Announced[5] 20 MW[1] Unknown type DEEP Earth Energy Production Corp. (DEEP) [100%][4] DEEP Earth Energy Production Corp. (DEEP)[5]
4 Announced[5] 35 MW[5] Unknown type DEEP Earth Energy Production Corp. (DEEP) [100%][4] DEEP Earth Energy Production Corp. (DEEP)[5]
Pilot, Rafferty Construction[6] 5 MW[6] Unknown type DEEP Earth Energy Production Corp. (DEEP)[6]

Location

Table 2: Unit-level location details for Estevan geothermal power plant

Unit name Location Coordinates (WGS 84)
1, Rafferty Estevan, Saskatchewan, Canada[4] 49.2998896, -103.3594255 (approximate)[4]
2 Estevan, Saskatchewan, Canada[4] 49.2998896, -103.3594255 (approximate)[4]
3 Estevan, Saskatchewan, Canada[4] 49.2998896, -103.3594255 (approximate)[4]
4 Estevan, Saskatchewan, Canada[4] 49.2998896, -103.3594255 (approximate)[4]
Pilot, Rafferty Estevan, Saskatchewan, Canada[4] 49.2998896, -103.3594255 (approximate)[4]

The map below shows the approximate locations of the geothermal power plant units:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20230331132533/https://regina.ctvnews.ca/geothermal-project-in-southeast-sask-to-begin-in-late-2023-1.6262324. Archived from the original on 2023-03-31. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240319062157/https://canada.constructconnect.com/dcn/news/technology/2023/09/steel-pipeline-network-to-transform-saskatchewans-geothermal-energy-to-electric-power. Archived from the original on 2024-03-19. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20221011015118/https://www.deepcorp.ca/. Archived from the original on 2022-10-11. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 https://web.archive.org/web/20220915193410/https://deepcorp.ca/about-deep/. Archived from the original on 2022-09-15. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://web.archive.org/web/20230107221659/https://www.thinkgeoenergy.com/deep-advancing-its-35-mw-geothermal-project-in-saskatchewan-canada/. Archived from the original on 2023-01-07. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://deepcorp.ca/canadas-first-5mw-pilot-project-for-conventional-geothermal-powers/. {{cite web}}: Missing or empty |title= (help)