Eungella wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Urannah Project, Bowen Renewable Energy Hub, Urannah Renewable Energy Hub, Batttery of the North
Eungella wind farm is an announced wind farm in Eungella, Queensland, Australia.
Project Details
Table 1: Phase-level project details for Eungella wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|
Announced[1] | 2038 (planned)[2] | 500 MW[1] | Onshore[3] | CS Energy Co Ltd; Bowen River Utilities PTY LTD; Renewable Energy Partners (REP); Copenhagen Infrastructure Partners (씨에스에너지 (주))[4][4][4][4] |
Location
Table 2: Phase-level location details for Eungella wind farm
Location | Coordinates (WGS 84) |
---|---|
Eungella, Queensland, Australia[5] | -20.8801, 148.5054 (approximate)[5] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240126063827/https://www.power-technology.com/marketdata/power-plant-profile-eungella-wind-farm-australia/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125152627/https://www.ecogeneration.com.au/wp-content/uploads/2021/01/WindMap-202102.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126064734/https://reneweconomy.com.au/plans-for-massive-600mw-wind-farm-unveiled-for-queensland/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240131170447/https://enerdatics.com/blog/renewable-energy-m-and-a-copenhagen-infrastructure-partners-cip-buys-into-a-5bn-renewable-energy-hub-in-australia/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240201030818/https://reneweconomy.com.au/rep-to-fast-track-500mw-wind-component-of-battery-of-the-north-renewables-hub-71805/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)