Euroing Bogdanci wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Bogdanci (Interenergo/Trigal) wind farm

Euroing Bogdanci wind farm is a wind farm in pre-construction in Bogdanci, North Macedonia.

Project Details

Table 1: Phase-level project details for Euroing Bogdanci wind farm

Status Commissioning year Nameplate capacity Type Owner
Pre-construction[1] 2024 (planned)[1] 30 MW[2] Onshore[2] Interenergo; Trigal DOO[2][2]

Location

Table 2: Phase-level location details for Euroing Bogdanci wind farm

Location Coordinates (WGS 84)
Bogdanci, North Macedonia[2] 41.2016, 22.5777 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.trigal.com/infrastructure/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240126025927/https://renewablesnow.com/news/slovenias-interenergo-trigal-to-build-40-mln-euro-wind-farm-in-n-macedonia-skopje-govt-734907/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)