Fallago Rig wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Fallago Rig 2 (Phase 2)
Fallago Rig wind farm is an operating wind farm in Borders, Scotland, United Kingdom.
Project Details
Table 1: Phase-level project details for Fallago Rig wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2013[1] | 144 MW[1] | Onshore[1] | EDF Renewables [100%] (法國電力再生能源公司)[1] | EDF Renewables (法國電力再生能源公司)[1] |
2 | Shelved[1] | – | 41 MW[1] | Onshore[1] | EDF Renewables [100%] (法國電力再生能源公司)[1] | EDF Renewables (法國電力再生能源公司)[1] |
Location
Table 2: Phase-level location details for Fallago Rig wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Borders, Scotland, Scotland, United Kingdom[1] | 55.8313, -2.6880 (exact)[1] |
2 | Borders, Scotland, Scotland, United Kingdom[1] | 55.8080, -2.4924 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References