Fangchenggang Jinxi Steel Technology Co Ltd (防城港津西型钢科技有限公司) is a blast furnace-basic oxygen furnace (BF-BOF) cancelled steel plant in Fangchenggang, Guangxi, China.

Location

The map below shows the approximate location of the plant in Fangchenggang, Guangxi, China:

Loading map...
  • Location: Gangkou District, Fangchenggang City, Guangxi Zhuang Autonomous Region
  • Coordinates (WGS 84): 21.646525, 108.369582 (approximate)

Background

The company planned to construct two 3000 m³ blast furnaces and two 200-ton converters in the year 2020.[1] However, in 2022, the company together with other institutions including the Fangchenggang Municipal Government, terminated the investment agreement, signaling the formal withdrawal of the project from Fangchenggang.[2]

Plant Details

Table 1: General Plant Details

Plant status Announced date
Cancelled[3][4] 2020-01[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Qian'an City Jiujiang Wire Co Ltd [100.0%] E100000123261 [100%] Fangchenggang Jinxi Steel Technology Co., Ltd.[5] 5081361413 E100000126944

Table 3: Process and Products

Main production equipment Detailed production equipment
BF, BOF[4] 2 BOF (2x200-tonne)[4]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
cancelled 4000 TTPA[4][4] 4000 TTPA[4][4]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
cancelled 5008 TTPA[6][7] 5008 TTPA[6][7]

Blast Furnace Details

Table 6: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown cancelled[3] 2020-01[7] unknown unknown 3000 m³[8] 2504[6] unknown unknown
unknown cancelled[3] 2020-01[7] unknown unknown 3000 m³[7] 2504[7] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "防城港津西型钢科技购买承德兆丰钢铁集团钢铁产能进行产能置换方案公告". 2020-01-21.
  2. "翅冀钢铁收购防城港津西型钢新进展:300亿钢铁项目正式退出防城港!". 世界金属导报. 2022-10-08.
  3. 3.0 3.1 3.2 https://mp.weixin.qq.com/s?__biz=MzA5ODEzMjgwNA==&mid=2656737120&idx=1&sn=3de46eebfe67b9309593a96a24e1f5dd&chksm=8b38014bbc4f885d3444075d4d53a13dce6c07b11a9bad91ad389cb92b862f60cf65313fce93&scene=27. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 http://www.lakegloria.com/news/detail-20200121-1597732.html. {{cite web}}: Missing or empty |title= (help)
  5. https://www.qcc.com/firm/bec536e01d4e98562bf779ee41df4603.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20220320150458/http://www.51zhengce.com/index.php?m=content&c=index&a=show&catid=4&id=131485. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 https://m.mysteel.com/20/0117/11/3AECA840B1BE9D75_abc.html. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20220318122244/https://www.sohu.com/a/367714648_313737. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)

Resources