Fas solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Fas solar farm is a solar photovoltaic (PV) farm in pre-construction in Cairo, Egypt.

Project Details

Table 1: Phase-level project details for Fas solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 500 MW[1] PV[1] Egyptian Electricity Transmission CO (EETC); Ministry of Electricity and Renewable Energy (Egypt); Fas Energy (فاس للطاقة)[2] Fas Energy (فاس للطاقة)[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Fas solar farm

Location Coordinates (WGS 84)
Cairo, Cairo, Egypt[3] 30.0120, 31.7456 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240201082821/https://www.mees.com/2022/7/1/news-in-brief/saudi-fas-energy-plans-egypt-500mw-solar-pv-plant/163accb0-f937-11ec-a16f-6572cd25820f. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  2. https://enterprise.press/ar/stories/2022/06/23/%D8%AA%D8%A7%D8%A8%D8%B9%D8%A9-%D9%84%D9%80-%D8%A7%D9%84%D8%AD%D9%83%D9%8A%D8%B1-%D8%AA%D8%B9%D8%AA%D8%B2%D9%85-%D8%A5%D9%86%D8%B4%D8%A7%D8%A1-%D9%85%D8%AD%D8%B7%D8%A9-%D8%B4%D9%85%D8%B3/, https://enterprise.press/ar/stories/2022/06/23/%D8%AA%D8%A7%D8%A8%D8%B9%D8%A9-%D9%84%D9%80-%D8%A7%D9%84%D8%AD%D9%83%D9%8A%D8%B1-%D8%AA%D8%B9%D8%AA%D8%B2%D9%85-%D8%A5%D9%86%D8%B4%D8%A7%D8%A1-%D9%85%D8%AD%D8%B7%D8%A9-%D8%B4%D9%85%D8%B3/ https://enterprise.press/ar/stories/2022/06/23/%D8%AA%D8%A7%D8%A8%D8%B9%D8%A9-%D9%84%D9%80-%D8%A7%D9%84%D8%AD%D9%83%D9%8A%D8%B1-%D8%AA%D8%B9%D8%AA%D8%B2%D9%85-%D8%A5%D9%86%D8%B4%D8%A7%D8%A1-%D9%85%D8%AD%D8%B7%D8%A9-%D8%B4%D9%85%D8%B3/, https://enterprise.press/ar/stories/2022/06/23/%D8%AA%D8%A7%D8%A8%D8%B9%D8%A9-%D9%84%D9%80-%D8%A7%D9%84%D8%AD%D9%83%D9%8A%D8%B1-%D8%AA%D8%B9%D8%AA%D8%B2%D9%85-%D8%A5%D9%86%D8%B4%D8%A7%D8%A1-%D9%85%D8%AD%D8%B7%D8%A9-%D8%B4%D9%85%D8%B3/, https://enterprise.press/ar/stories/2022/06/23/%D8%AA%D8%A7%D8%A8%D8%B9%D8%A9-%D9%84%D9%80-%D8%A7%D9%84%D8%AD%D9%83%D9%8A%D8%B1-%D8%AA%D8%B9%D8%AA%D8%B2%D9%85-%D8%A5%D9%86%D8%B4%D8%A7%D8%A1-%D9%85%D8%AD%D8%B7%D8%A9-%D8%B4%D9%85%D8%B3/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://maps.app.goo.gl/MWT7ZZnVFK72QwaF8. {{cite web}}: Missing or empty |title= (help)