Flatbed Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Flatbed Coal Mine is a shelved coal mine in Gordon Creek, British Columbia, Canada.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Flatbed Coal Mine | Gordon Creek, British Columbia, Canada[1][2] | 54.912639, -120.893586 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Project Type | Opening Year | Closing Year |
---|---|---|---|---|
Shelved | Pre-Permit[1] | New | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
2[1] | – | – | Underground[2] | Longwall | 90.7[2] | 494* | * |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
– | – | 298[1] | Peace River[2] | Bituminous[2] | Met[1] | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Colonial Coal International Corp[2] | Colonial Coal International Corp [100%] | Canada |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background
Flatbed Coal Mine (also known as the Gordon Creek project) is a proposed underground mine project in the Peace River Coalfield, British Columbia, Canada.[3]
As of November 2023, there have been no recent updates on this project and it appears to be shelved. Colonial Coal's Flatbed project is located between approximately 8 and 10 kilometers from the company's existing Quintette and PRC loadouts. The property is adjacent to Anglo American’s Trend Mine and Teck Coal’s Window proposed mine, and has the potential for a large tonnage deposit, with a 100+ Mt coking coal resource target.[3]
While there have been no recent updates on this project, reports from the fiscal year ending July 31, 2022, reveal that coal license renewal fees were paid, suggesting that the mine project is still active.[4]
- Operator: Colonial Coal International Corporation[3]
- Owner: Colonial Coal International Corporation
- Location: Near Quintette, British Columbia, Canada[3]
- GPS coordinates: 54.912639, -120.893586 (exact)
- Mine status: Shelved
- Start year: TBD
- Capacity: 1.6 - 2.6 million tonnes per annum, with average of 1.9 Mtpa[5]
- Total Resources: 298 million tonnes[3]
- Coal type: Metallurgical, Bituminous[3]
- Mine size: 9,077 hectares
- Mine type: Underground[3]
- Number of employees:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://www.ccoal.ca/wp-content/uploads/2023/06/ccoal_presentation-2023-05-31.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240722231345/https://www.ccoal.ca/projects/flatbed/. Archived from the original on 22 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 Colonial Coal International, Flatbed Coal Project, Company Website, accessed September 2021
- ↑ Extractive Sector Transparency Measures Act - Annual Report, Colonial Coal International Corp., Accessed 16 November 2023.
- ↑ 2023 May Investor Presentation, Colonial Coal website, Accessed 16 November 2023.