Other names: , Haishuo (Formosa IV-2) Offshore Wind Power Plan, Hai Ding (Formosa III) Offshore Wind Power Plan - Farm No. 2, 海洋竹南离岸式风力发电计画, Hai Neng (Formosa II) Offshore Wind Power Plan, 海鼎離岸式風力發電計畫2號風場, Haiding 3 (Site 17) Formosa III Offshore wind farm, Haisheng (Formosa IV-3) Offshore Wind Power Plan, 海能離岸風力發電計畫, Ocean Zhu-Nan (Formosa I) Offshore Wind Power Plan, Haiding 1 (Site 11) Formosa III Offshore wind farm, 海鼎离岸式风力发电计画2号风场, Haifeng (Formosa IV-1) Offshore Wind Power Plan, 海能离岸风力发电计画, Haiding 2 (Site 16) Formosa III Offshore wind farm, 海洋竹南離岸式風力發電計畫, 海鼎離岸風電
Formosa wind farm (local name: 海鼎離岸式風力發電計畫2號風場) is an operating wind farm near Zhunan, Miaoli, Taiwan.
Project Details
Table 1: Phase-level project details for Formosa wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|---|
2 | Operating[1] | 2019[2] | 120 MW[3] | Offshore hard mount | Ørsted [35%]; JERA [32.5%]; Macquarie Capital [25%]; other[1] | Ørsted[4] |
3 | Construction[5] | 2025 (planned)[6] | 376 MW[7] | Offshore hard mount | JERA [49%]; Macquarie Capital[26%]; Swancor [25%][8] | Ørsted[4] |
4 | Construction[9] | 2025 (planned)[10] | 552 MW[10] | Offshore hard mount | JERA Co., Ltd.; Macquarie Capital; EnBW Energie Baden-Württemberg AG[10] | Ørsted[4] |
5 | Development[9] | 2025 (planned)[10] | 732 MW[10] | Offshore hard mount | JERA Co., Ltd.; Macquarie Capital; EnBW Energie Baden-Württemberg AG[10] | Ørsted[4] |
6 | Development[9] | 2025 (planned)[10] | 720 MW[10] | Offshore hard mount | JERA Co., Ltd.; Macquarie Capital; EnBW Energie Baden-Württemberg AG[10] | Ørsted[4] |
7 | Announced[11] | 2025 (planned)[11] | 1400 MW[11] | Offshore hard mount | Swancor Renewable Energy[11] | |
8 | Announced[11] | 2025 (planned)[11] | 1400 MW[11] | Offshore floating | Swancor Renewable Energy[11] | |
9 | Announced[11] | 2025 (planned)[11] | 1400 MW[11] | Offshore hard mount | Swancor Renewable Energy[11] |
Location
Table 2: Phase-level location details for Formosa wind farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
2 | Zhunan, Miaoli, Taiwan[12] | 24.7109, 120.8141 (approximate)[12] |
3 | Houlong, Miaoli, Taiwan[12] | 24.71, 120.76 (approximate)[12] |
4 | Zhunan, Miaoli, Taiwan[12] | 24.7109, 120.8141 (exact)[12] |
5 | Toufen, Miaoli, Taiwan[12] | 24.0829, 119.756 (approximate)[13][14] |
6 | Toufen, Miaoli, Taiwan[12] | 24.0811, 119.894 (approximate)[15][16] |
7 | Miaoli, Taiwan[11] | 24.7861, 120.3589 (approximate)[11] |
8 | Miaoli, Taiwan[11] | 24.7861, 120.3589 (approximate)[11] |
9 | Miaoli, Taiwan[11] | 24.7861, 120.3589 (approximate)[11] |
The maps below show the locations of the wind farm phases:
Phase 4 in None, Taiwan (exact location).
The map below shows the approximate locations of the wind farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Ørsted inaugurates its first offshore wind farm in Taiwan". Archived from the original on July 29, 2021. Retrieved August 24, 2021.
- ↑ "gwec.net/wp-content/uploads/2020/10/FuChing-Chen-MIRDC.pdf" (PDF). Archived from the original (PDF) on July 29, 2021. Retrieved August 26, 2021.
- ↑ "Offshore wind farm Formosa 1 phase 2, Taiwan". Jan De Nul. Archived from the original on January 24, 2021. Retrieved August 24, 2021.
- ↑ 4.0 4.1 4.2 4.3 4.4 "Ørsted wins 920MW offshore wind projects in Taiwan". Archived from the original on July 29, 2021. Retrieved August 24, 2021.
- ↑ "海能風電". Archived from the original on July 29, 2021. Retrieved August 24, 2021.
- ↑ "Taiwanese 376 MW Formosa 2 offshore wind project set for launch". Archived from the original on July 29, 2021. Retrieved August 24, 2021.
- ↑ "www.siemensgamesa.com/-/media/siemensgamesa/downloads/en/newsroom/2019/10/pressrelease-siemens-gemesa-of-tw-formosa-2-en.pdf" (PDF). Archived from the original (PDF) on July 29, 2021. Retrieved August 26, 2021.
- ↑ "海能風電". Archived from the original on July 29, 2021. Retrieved August 24, 2021.
- ↑ 9.0 9.1 9.2 "Manufacturers and Project Developers Prepare for Phase 3 of Formosa 3 Offshore Wind Project". Archived from the original on July 29, 2021. Retrieved August 24, 2021.
- ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 "formosa3windpower.com/en". Archived from the original on July 29, 2021. Retrieved August 26, 2021.
- ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 "Formosa 4 Offshore Wind Farm – Swancor Renewable Energy". Archived from the original on January 26, 2021. Retrieved August 24, 2021.
- ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 "Eiger's Map and Guide to Taiwan's Offshore Wind Farm Projects". Eiger. Archived from the original on July 29, 2021. Retrieved August 24, 2021.
- ↑ https://map.4coffshore.com/offshorewind/index.aspx?lat=24.083&lon=119.756&wfid=TW39.
{{cite web}}
: Cite has empty unknown parameter:|data=
(help); Missing or empty|title=
(help)CS1 maint: url-status (link) - ↑ https://www.4coffshore.com/windfarms/taiwan/haiding-2---formosa-iii-taiwan-tw39.html.
{{cite web}}
: Cite has empty unknown parameter:|data=
(help); Missing or empty|title=
(help)CS1 maint: url-status (link) - ↑ https://www.4coffshore.com/windfarms/taiwan/haiding-3---formosa-iii-taiwan-tw40.html.
{{cite web}}
: Cite has empty unknown parameter:|data=
(help); Missing or empty|title=
(help)CS1 maint: url-status (link) - ↑ https://map.4coffshore.com/offshorewind/index.aspx?lat=24.081&lon=119.894&wfid=TW40.
{{cite web}}
: Cite has empty unknown parameter:|data=
(help); Missing or empty|title=
(help)CS1 maint: url-status (link)