Fort Stewart Solar Facility

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: FT Stewart solar

Fort Stewart Solar Facility is an operating solar photovoltaic (PV) farm in Liberty County, Georgia, United States.

Project Details

Table 1: Phase-level project details for Fort Stewart Solar Facility

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2016[1] 30 MWac[1] PV[1] Georgia Power Co [100%][2] Georgia Power[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Fort Stewart Solar Facility

Location Coordinates (WGS 84)
Liberty County, Georgia, United States[3] 31.899, -81.574 (exact)[3]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240206200321/https://www.prnewswire.com/news-releases/georgia-power-dedicates-new-30-mw-solar-facility-at-fort-stewart-300376177.html. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240402052142/https://wiki-solar.org/. Archived from the original on 02 April 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)