Fujian Gas Pipeline Network

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Fujian Gas Pipeline Network 福建天然气管网 is a collection of proposed, in construction, and operating pipelines in Fujian Province, China.


Location

Network background

Network details

Fujian LNG Terminal Transport Pipeline 福建LNG外输管线

The pipeline is also known as "Strait West Gas Pipeline Network Phase I".[1] It supplies natural gas to 5 major coastal cities along the pipeline, Fuzhou, Putian, Xiamen, Jinjiang and Zhangzhou, including 3 gas power stations.[2]

The Fujian LNG receiving station primarily sources its natural gas from Indonesia's Donggu gas field and also receives LNG resources from 13 countries and regions along the 'Belt and Road' initiative, including Malaysia, Nigeria, and Qatar.[3]

The pipeline runs from Fujian LNG Terminal in Xiuyu, Putian, Fujian to Cangshan/Longan, Fuzhou/Zhangzhou, Fujian.

Loading map...
  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. ((60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co.,Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[4]
  • Parent Company:
  • Capacity: 7.6 billion cubic meters per year[5]
  • Length: 356.13 km[6]
  • Diameter:
  • Status: Operating[5]
  • Start Year: 2008[5]
  • Cost:


Strait West Natural Gas Pipeline Network Phase II 海西天然气管网二期工程

Strait West Natural Gas Pipeline Network Phase II 海西天然气管网二期工程, also translated as Haixi Natural Gas Pipeline Network Phase II, is a pipeline network with segments that are operating and in construction in Fujian Province, China. It is located along the western bank of the Taiwan Strait, and inherits its name west strait from this geographical location.

The Strait West Natural Gas Pipeline Network Phase II is described as an important natural gas interconnection project in Fujian Province. It was originally estimated to have a total length of 830 kilometers and a total investment of over 10 billion RMB. The approval process took two years and three months.[7]

  • Construction for the Zhangzhou–Zhao'an Gas Pipeline segment began in 2013. The pipeline was divided into two sections for approval, from Zhangzhou to Zhangpu and from Zhangpu to Zhao'an, and the full pipeline was reportedly finished with construction and operational at the beginning of 2020.
  • Construction on the Fuzhou–Sanming Gas Pipeline began on June 28, 2021.
  • The Fuzhou–Fuding Gas Pipeline segment began operating in December, 2020.
  • Construction on the Quanzhou–Dehua Branch segment began on May 28, 2021 with an investment of 1.34 billion RMB.
Loading map...

Zhangzhou–Zhao'an Gas Pipeline 漳州—诏安段

The pipeline has been completed but has not yet been put into operation.[8]

Loading map...
  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4][9]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. ((60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Capacity:
  • Length: 182.90 km[9]
  • Diameter: 813mm[9]
  • Status: Construction[9]
  • Start year:
  • Cost: The total investment for Zhangzhou–Zhao'an Gas Pipeline and Zhangzhou–Longyan Gas Pipeline is 1.8 billion RMB.[11]

Zhangzhou–Longyan Gas Pipeline 漳州—龙岩段

The pipeline has been completed but has not yet been put into operation.[8]

Loading map...
  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4][9]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. ((60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Parent Company:
  • Capacity:
  • Length: 100.36 km[9]
  • Diameter: 813 mm[9]
  • Status: construction[9]
  • Start year:
  • Cost: The total investment for Zhangzhou–Zhao'an Gas Pipeline and Zhangzhou–Longyan Gas Pipeline is 1.8 billion RMB.[11]

Fuzhou–Sanming Gas Pipeline 福州—三明段

Loading map...
  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. ((60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Parent Company:
  • Capacity: 1.6 bcm/ year[12]
  • Length: 286.6 kilometers[12]
  • Diameter: 813 millimeters[12]
  • Status: Construction[12]
  • Start year: 2022[12]
  • Cost: 2.9 billion RMB[13]
Fuzhou-Fuding Gas Pipeline.png

Fuzhou–Fuding Gas Pipeline 福州—福鼎段

Loading map...
  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. ((60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Parent Company:
  • Capacity:
  • Length: 256.8 kilometers[14]
  • Diameter: 813 mm
  • Status: Shelved[15]
  • Start year: 2020[14]
  • Cost:

Quanzhou–Dehua Branch 德化支线 (泉州—德化)

Loading map...
  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4][16]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. ((60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Parent Company:
  • Capacity: 1.07 bcm/year[16]
  • Length: 119.12 km[16]
  • Diameter: 508 mm[16]
  • Status: Operating[16]
  • Start year: 2022[16]
  • Cost: 215 million RMB[17]

Zhangzhou LNG Connecting Gas Pipeline 漳州LNG联络线

Loading map...
  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. (60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Parent Company:
  • Capacity: 4.2 billion cubic meters per year[18]
  • Length: 77.8 kilometers[18]
  • Diameter: 1016mm[18]
  • Status: Construction[18]
  • Start year:
  • Cost:

Zhangzhou LNG Connecting Gas Pipeline Extension 漳州LNG联络线延伸段

Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4][19]

  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. (60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Parent Company:
  • Capacity: 4.2 billion cubic meters per year[20]
  • Length: 36 kilometers[20]
  • Diameter: 1016mm[20]
  • Status: Construction[19]
  • Start year:
  • Cost: 713 million RMB[20]

Fujian Fuqing LNG Export Pipeline Network 福建福清LNG外输管道

The pipeline starts at the Fujian LNG Terminal in Fujian, China to supply LNG to Fuqing, Fujian, China. More specifically, the pipeline would begin at the first station of Lianfeng in western Lianfeng Village, Donghang, Fuqing City, China, and would end at at a transmission station in Jingyang Town, Fuqing City, Fuzhou City.

Loading map...
  • Operator: PetroChina Kunlun Gas Company Limited Fujian Branch (中石油昆仑燃气有限公司福建分公司)[21]
  • Owner: PetroChina Kunlun Gas Company Limited (中石油昆仑燃气有限公司)[21]
  • Parent Company: KUNLUN ENERGY COMPANY LIMITED (昆仑能源有限公司)[22]
  • Capacity: 3.39 billion cubic meters per year[23]
  • Length: 107 kilometers[23]
  • Diameter: 1016mm[23]
  • Status: Proposed[23]
  • Start year:
  • Cost:

Luoyuan-Fuding Gas Pipeline 罗源-福鼎输气管道

  • Operator: National Pipe Network Group Fujian Pipe Network Co., Ltd. (国家管网集团福建省管网有限公司)[4][24]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co.,Ltd. (60.0002%) (国家石油天然气管网集团有限公司), Fujian Province Investment Development Group Co., Ltd.(39.9998%)(福建省投资开发集团有限责任公司)[10]
  • Parent Company:
  • Capacity: 0.49 billion cubic meters per year[25]
  • Length: 180 kilometers[25]
  • Diameter: 813mm[26]
  • Status: Construction[25]
  • Start year:
  • Cost: 1.7 billion RMB[25]

Wuyi New Area Natural Gas Pipeline 武夷新区天然气管道

  • Operator: Nanping Construction Group Co., Ltd. (南平建设集团有限公司)[27]
  • Owner: Nanping Wuyi Development Group Co.,Ltd.(90%)(南平武夷发展集团有限公司), Fujian Provincial Department of Finance(10%)(福建省财政厅)
  • Parent Company:
  • Capacity:
  • Length: 145 kilometers
  • Diameter:
  • Status: Proposed
  • Start year:
  • Cost: 2 bcm/year

Xinjiang Coal-to-Gas Pipeline Project Sanming Segment 新疆煤制天然气外输管道(三明段)

  • Operator: State Pipe Network Group Xinjiang Coal To Natural Gas Export Pipeline Co.,Ltd. (国家管网集团新疆煤制天然气外输管道有限公司)[28]
  • Owner: National Petroleum and Natural Gas Pipeline Network Group Co., Ltd. (93.2221%)(国家石油天然气管网集团有限公司), Zhejiang Energy Gas Group Co., Ltd. (5.0003%)(浙江能源天然气集团有限公司), Xinjiang Investment Development (Group) Co., Ltd. (1.7776%)(新疆投资发展(集团)有限责任公司)
  • Parent Company:
  • Capacity:
  • Length: 113 kilometers
  • Diameter: 813mm[29]
  • Status: Proposed
  • Start year:
  • Cost: 1.2 billion RMB

Articles and resources

References

  1. "福建液化天然气项目稳步推进 产业链加速延伸". www.gov.cn. 2009-11-01. Retrieved 2021-09-23.{{cite web}}: CS1 maint: url-status (link)
  2. "福建LNG为海西又好又快发展鼓气 海西 | 福建新闻". news.sina.com.cn. 2009-06-24. Retrieved 2021-09-23.{{cite web}}: CS1 maint: url-status (link)
  3. "福建LNG接收站累计外输天然气超600亿方". 2023-08-27. Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 "国家管网集团福建省管网有限公司". QCC. Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 5.2 "油气管网设施运营企业基本情况" (PDF). Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  6. "中海油福建LNG站线项目2007年底储罐成功升顶". 2006-11-09. Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  7. 福建海西天然气管网二期工程全部获得核准, SASAC, Jun. 26, 2013, accessed Aug. 30, 2021.
  8. 8.0 8.1 "漳州市"十四五"能源发展专项规划" (PDF). Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 "海西天然气管网二期工程(漳州-龙岩和漳州-诏安段)站场、阀室10KV外线及配电工程施工招标公告". 2019-06-10. Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 "国家管网集团福建省管网有限公司". QCC. Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  11. 11.0 11.1 "漳浦:海西天然气管网二期工程完成完工检查". 2020-01-16. Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  12. 12.0 12.1 12.2 12.3 12.4 海西天然气管网二期工程 (福州—三明段) 全面开工, PipeChina, Jun. 29, 2021, accessed Aug. 30, 2021.
  13. "海西天然气管网二期工程(福州-三明段)全面开工". 2021-06-29. Retrieved 2023-09-14.{{cite web}}: CS1 maint: url-status (link)
  14. 14.0 14.1 福建省这两个天然气基础设施重点工程按期建成, Nov. 2, 2020, accessed Aug. 30, 2021.
  15. 宁德“管输气”开工十余年未投产,发改委:管道有变形等缺陷, 2023-02-02, accessed 2023-09-17
  16. 16.0 16.1 16.2 16.3 16.4 16.5 "福建天然气管网德化支线正式投产". 2022-12-14. Retrieved 2023-09-16.{{cite web}}: CS1 maint: url-status (link)
  17. "天然气管网公司德化支线项目获省发改委核准!". 2017-12-18. Retrieved 2023-09-16.{{cite web}}: CS1 maint: url-status (link)
  18. 18.0 18.1 18.2 18.3 "福建管网二期工程漳州LNG联络线正式启动". finance.sina.com.cn. 2021-11-28. Retrieved 2022-09-16.{{cite web}}: CS1 maint: url-status (link)
  19. 19.0 19.1 "国家管网漳州LNG外输管道工程延伸段项目正式开工". 202-03-06. Retrieved 2022-09-18. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  20. 20.0 20.1 20.2 20.3 "漳州LNG外输管道工程延伸段社会稳定风险征询意见公示". 2021-02-08. Retrieved 2022-09-18.{{cite web}}: CS1 maint: url-status (link)
  21. 21.0 21.1 "中石油昆仑燃气有限公司福建分公司". QCC. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  22. "昆仑能源有限公司". QCC. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  23. 23.0 23.1 23.2 23.3 "福建LNG接收站配套外输管道工程环境影响评价及海域使用论证招标公告". 2021-10-06. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  24. "福建省发展和改革委员会关于海西天然气管网二期工程(罗源-福鼎段)项目单位变更的复函". 2022-04-19. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  25. 25.0 25.1 25.2 25.3 "中海油福建四项目开工总投资约180亿". 2012-08-07. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  26. "海西天然气管网二期工程(罗源-福鼎段)福鼎市境内一般线路使用林地可行性报告". 2020-04-08. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  27. "南平建设集团有限公司". QCC. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  28. "国家管网集团新疆煤制天然气外输管道有限公司". QCC. Retrieved 2023-09-18.{{cite web}}: CS1 maint: url-status (link)
  29. "最新消息!三明将用风力发电~5个项目列入2016年全省风电开发计划". 2023-03-16.{{cite web}}: CS1 maint: url-status (link)