Fujian Putian Shimen'ao Cogen power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Fujian Putian Shimen'ao Cogen power station (福建莆田市石门澳产业园热电) is an operating power station of at least 160-megawatts (MW) in Shimen'ao, Xiuyu, Putian, Fujian, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Fujian Putian Shimen'ao Cogen power station | Shimen'ao, Xiuyu, Putian, Fujian, China | 25.224679, 119.024749 (exact) |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Phase II Unit 4: 25.224679, 119.024749
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase II Unit 3 | Operating[1] | coal: unknown | 80 | CFB | 2023 |
Phase II Unit 4 | Operating | coal: unknown | 80 | CFB | 2024[1] |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase II Unit 3 | Fujian EVERSUN Technology Co Ltd [100%] | Putian City state-owned Assets Investment Co Ltd [32.7%]; Wing Wing Group Ltd [22.0%]; Fujian Pingtan Yonghong Investment Co Ltd [15.3%]; China Development Bank Corp [11.1%]; Fujian Local Industry Equity Investment Fund Partnership LP [10.0%]; unknown [6.5%]; Xiamen Fuyuanda Chemical Co Ltd [2.5%] |
Phase II Unit 4 | Fujian EVERSUN Technology Co Ltd [100%] | Putian City state-owned Assets Investment Co Ltd [32.7%]; Wing Wing Group Ltd [22.0%]; Fujian Pingtan Yonghong Investment Co Ltd [15.3%]; China Development Bank Corp [11.1%]; Fujian Local Industry Equity Investment Fund Partnership LP [10.0%]; unknown [6.5%]; Xiamen Fuyuanda Chemical Co Ltd [2.5%] |
Background
The "Putian Shimen'ao Industrial Park Cogeneration Phase II Project" was proposed in Shimenao Industrial Park, Xiuyu District, Putian City, Fujian Province. The project was projected to include a new 3×910t/ h High temperature and high pressure circulating fluidized bed boiler (dual use and one backup) and 2 x 80 MW "back pressure steam turbine generator set."[2]
By October 2022, the construction was ongoing[3] and appeared nearly complete based on Planet satellite imagery. It appeared there were three existing boiler buildings, so Phase I may have three power generating units. Details were unknown.
In June 2023, it was reported that the units of the second phase of the power project were connected to the power grid.[4] At the time of report, one 80 MW unit had begun commercial operation.[4]
Articles and Resources
References
- ↑ 1.0 1.1 https://pt.fjsen.com/xw/2024-01/11/content_31498589.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 福建莆田市石门澳产业园热电联产二期项目环境影响报告书的批复, BJX, 2022-03-15
- ↑ "秀屿:节日鏖战不休 热电联产二期项目全力推进中," PTBTV, 2022-10-07
- ↑ 4.0 4.1 莆田市石门澳产业园热电联产二期项目并网发电 BJX, 2023-06-08