Fujian Sansteel Minguang Co., Ltd. Gas Power Project
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Fujian Sansteel Minguang Co., Ltd. Gas Power Project (福建三钢闽光股份有限公司80MW煤气高效发电机组) is an operating power station of at least 240-megawatts (MW) in Sanyuan District, Sanming, Fujian, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Fujian Sansteel Minguang Co., Ltd. Gas Power Project | Sanyuan District, Sanming, Fujian, China | 26.257284, 117.614241 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, 3: 26.257284, 117.614241
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2] | industrial by-product: blast furnace gas[2] | 80[2] | steam turbine[2] | not found | 2017[2] |
2 | Operating[3] | industrial by-product: blast furnace gas[4] | 80[4] | steam turbine[5] | not found | 2023[3] |
3 | Operating[6] | industrial by-product: blast furnace gas[4] | 80[4] | steam turbine[5] | not found | 2023[6] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Sansteel Minguang Co Ltd Fujian [100%][4][1] | Fujian Metallurgical Holding Co Ltd [53.4%]; other [46.6%] |
2 | Sansteel Minguang Co Ltd Fujian [100%][4][1] | Fujian Metallurgical Holding Co Ltd [53.4%]; other [46.6%] |
3 | Sansteel Minguang Co Ltd Fujian [100%][4][1] | Fujian Metallurgical Holding Co Ltd [53.4%]; other [46.6%] |
Project-level captive use details
- Captive industry use (heat or power): power[4]
- Captive industry: Iron & Steel[4]
- Non-industry use: none[4]
Background
Unit 1 was commissioned and connected to the grid in 2017.[7]
In October 2022, the Fujian Provincial Development and Reform Commission approved the Unit 2 and Unit 3 projects. [8]On August 22, 2023, Unit 2 was successfully connected to the grid.[9] Unit 3 is expected to be completed in November 2023.[10]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 https://cti-cert.com.tw/new/5732.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://news.cc123.com/falv/d099114757d4fcf7.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://m.bjx.com.cn/mnews/20230829/1328749.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 https://archive.org/details/screenshot-2023-05-29-at-1.53.33-pm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.cacem.com.cn/index.php?m=content&c=index&a=show&catid=95&id=15183.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://m.bjx.com.cn/mnews/20231121/1344651.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "福建省经信委关于福建三钢闽光股份有限公司80MW煤气高效发电机组并网运行条件确认的批复". 2017-12-20. Retrieved 2323-10-17.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "福建省发展和改革委员会关于三钢闽光动力厂两台煤气高效发电机组项目核准的批复". 2022-10-10. Retrieved 2023-10-17.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "三钢闽光动力厂煤气发电项目1#机组成功并网发电!". 2023-08-29. Retrieved 2023-10-17.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "福建三钢闽光股份有限公司动力厂两台煤气高效发电机组调试试运行项目招标公告". 2022-12-22. Retrieved 2023-10-17.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.