Fukunan Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Fukunan Gas Pipeline was a proposed natural gas pipeline in Japan.[1]
Location
The pipeline would run between the Fukukita Plant (福北工場) in Fukuoka city ( 福岡市) through Kusuga and Kurume to the Omuta Governor Station (大牟田ガバナステーション) in Omuta City (大牟田市), Fukuoka prefecture, Japan.[2]
Project Details
- Operator: Saibu Gas
- Owner: Saibu Gas
- Parent Company: Saibu Gas
- Capacity:
- Length: Approx. 90 km[2]
- Diameter:
- Status: Cancelled[2]
- Start Year: 2002[1]
- Cost:
- Financing:
- Associated Infrastructure:
Background
In 2005, Saibu Gas decided to postpone the construction of the Fukunan Trunk Line for a long period of time. [2] No updates were found ever since.
Articles and resources
References
- ↑ 1.0 1.1 Corporate Profile, Saibu Gas, February 2019
- ↑ 2.0 2.1 2.2 2.3 [http://www.saibugas.co.jp/nr/htmls/2007/nr487.htm Press Release: "福南幹線建設計画の長期延期について," November 21, 2007