Futuro solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Futuro solar farm (Parque Solar Futuro) is a solar photovoltaic (PV) farm in pre-construction in Região Geográfica Intermediária de Mossoró, Rio Grande do Norte, Brazil.
Project Details
Table 1: Phase-level project details for Futuro solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
2 | Pre-construction[1] | 50 MWp/dc[1] | PV[1] | KL Serviços de Engenharia SA [100%][2] |
3 | Pre-construction[1] | 50 MWp/dc[1] | PV[1] | KL Serviços de Engenharia SA [100%][2] |
4 | Pre-construction[1] | 50 MWp/dc[1] | PV[1] | KL Serviços de Engenharia SA [100%][2] |
5 | Pre-construction[1] | 30 MWp/dc[1] | PV[1] | KL Serviços de Engenharia SA [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Futuro solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
2 | Região Geográfica Intermediária de Mossoró, Rio Grande do Norte, Brazil[2] | -5.4401, -37.0001 (approximate)[2] |
3 | Região Geográfica Intermediária de Mossoró, Rio Grande do Norte, Brazil[2] | -5.4501, -36.9901 (approximate)[2] |
4 | Região Geográfica Intermediária de Mossoró, Rio Grande do Norte, Brazil[2] | -5.4601, -36.9801 (approximate)[2] |
5 | Região Geográfica Intermediária de Mossoró, Rio Grande do Norte, Brazil[2] | -5.4301, -37.0001 (approximate)[2] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 https://web.archive.org/web/20240201153531/https://www.in.gov.br/web/dou/-/resolucoes-autorizativas-de-19-de-abril-de-2022-394932009. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)