Fuxin Coal gasification power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Fuxin Coal gasification power station (大唐国际阜新煤制天然气公司动力岛) is an operating power station of at least 100-megawatts (MW) in Changyingzi Town, Xinqiu District, Fuxin, Liaoning, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Fuxin Coal gasification power station Changyingzi Town, Xinqiu District, Fuxin, Liaoning, China 42.053821, 121.827257 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase I Unit 3, Phase II Unit 4, Phase III Unit 5: 42.053821, 121.827257

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating coal: unknown 50 subcritical 2020
Phase I Unit 2 operating coal: unknown 50 subcritical 2020
Phase I Unit 3 cancelled coal: unknown 30 subcritical
Phase II Unit 4 cancelled coal: unknown 30 subcritical
Phase III Unit 5 cancelled coal: unknown 30 subcritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase I Unit 2 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase I Unit 3 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase II Unit 4 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]
Phase III Unit 5 Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%]

Project-level captive use details

  • Captive industry use (heat or power): both
  • Captive industry: Chemicals


Background

In 2012 China Datang was planning a 400 MW coal-fired plant in Fuxin city.[1] The power station was a coal gasification plant.[2]

However, by 2014 there had been no developments on the project, which was apparently abandoned. Instead, Datang began building a 4 billion cubic meter/year coal gasification plant in Fuxin, which the company had been trying to sell.[3]

As of 2018 China Datang was still owner of the coal gasification plant, with 190 MW of coal-fired power supporting the gasification. 100 MW of that capacity was under construction.[4]

Units 1-2 totaling 100 MW were commissioned in 2020.[5][6]

As of June 2021 there have been no developments on units 4-5, which appear to be cancelled. In June 2022, Phases II and III (Units 3-5) were officially cancelled by the Liaoning Provincial Development and Reform Commission.[7]

Articles and Resources

References

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.