Fuxin Coal gasification power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Fuxin Coal gasification power station (大唐国际阜新煤制天然气公司动力岛) is an operating power station of at least 100-megawatts (MW) in Changyingzi Town, Xinqiu District, Fuxin, Liaoning, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Fuxin Coal gasification power station | Changyingzi Town, Xinqiu District, Fuxin, Liaoning, China | 42.053821, 121.827257 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase I Unit 3, Phase II Unit 4, Phase III Unit 5: 42.053821, 121.827257
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: unknown | 50 | subcritical | 2020 |
Phase I Unit 2 | operating | coal: unknown | 50 | subcritical | 2020 |
Phase I Unit 3 | cancelled | coal: unknown | 30 | subcritical | – |
Phase II Unit 4 | cancelled | coal: unknown | 30 | subcritical | – |
Phase III Unit 5 | cancelled | coal: unknown | 30 | subcritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] | China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%] |
Phase I Unit 2 | Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] | China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%] |
Phase I Unit 3 | Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] | China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%] |
Phase II Unit 4 | Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] | China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%] |
Phase III Unit 5 | Liaoning Datang International Fuxin COAL-TO-SNG Co Ltd [100%] | China Datang Corp [35.0%]; China Guoxin Holding Corp [35.0%]; China Chengtong Holdings Group Ltd [30.0%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Chemicals
Background
In 2012 China Datang was planning a 400 MW coal-fired plant in Fuxin city.[1] The power station was a coal gasification plant.[2]
However, by 2014 there had been no developments on the project, which was apparently abandoned. Instead, Datang began building a 4 billion cubic meter/year coal gasification plant in Fuxin, which the company had been trying to sell.[3]
As of 2018 China Datang was still owner of the coal gasification plant, with 190 MW of coal-fired power supporting the gasification. 100 MW of that capacity was under construction.[4]
Units 1-2 totaling 100 MW were commissioned in 2020.[5][6]
As of June 2021 there have been no developments on units 4-5, which appear to be cancelled. In June 2022, Phases II and III (Units 3-5) were officially cancelled by the Liaoning Provincial Development and Reform Commission.[7]
Articles and Resources
References
- ↑ "Fuxin Ethanol Powerplant," Enipedia, updated Nov 4, 2012
- ↑ 发改委同意建设大唐阜新煤制气项目03-17-2010, 中国化工报
- ↑ 大唐煤制气项目成烫手山芋 神华集团接盘顾虑重重 January 10, 2015, 中国经营报
- ↑ "大唐阜新煤制天然气项目工程开工-国际燃气网," 行业要闻, Apr 27, 2018
- ↑ "辽宁阜新40亿方煤制天然气项目正式投入商业运营,"中国煤炭资源网, CN Energy News, 2020-01-22
- ↑ 省发展改革委关于核定辽宁大唐国际阜新煤制天然气有限责任公司自备电厂上网电价的函 省发展改革委, 09-02-2019
- ↑ 对省十三届人大六次会议盘活大唐阜新煤制天然气项目助力阜新转型振兴(第1570号)的答复 辽宁省发展和改革委员会, June 13, 2022
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.