Fuzhou Kemen power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Fuzhou Kemen power station (华电可门电厂) is an operating power station of at least 2400-megawatts (MW) in Kengyuan Town, Lianjiang, Fuzhou, Fujian, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Fuzhou Kemen power station | Kengyuan Town, Lianjiang, Fuzhou, Fujian, China | 26.3734254, 119.7622418 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 26.3734254, 119.7622418
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: bituminous | 600 | supercritical | 2006 |
Phase I Unit 2 | operating | coal: bituminous | 600 | supercritical | 2006 |
Phase II Unit 3 | operating | coal: bituminous | 600 | supercritical | 2008 |
Phase II Unit 4 | operating | coal: bituminous | 600 | supercritical | 2008 |
Phase III Unit 5 | construction | coal: bituminous | 1000 | ultra-supercritical | – |
Phase III Unit 6 | construction | coal: bituminous | 1000 | ultra-supercritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Fujian Huadian Kemen Power Generation Co Ltd [100%] | China Huadian Group Corp [51.4%]; Ningbo Meishan Free Trade Port Chuangze Equity Investment Partnership LP [48.6%] |
Phase I Unit 2 | Fujian Huadian Kemen Power Generation Co Ltd [100%] | China Huadian Group Corp [51.4%]; Ningbo Meishan Free Trade Port Chuangze Equity Investment Partnership LP [48.6%] |
Phase II Unit 3 | Fujian Huadian Kemen Power Generation Co Ltd [100%] | China Huadian Group Corp [51.4%]; Ningbo Meishan Free Trade Port Chuangze Equity Investment Partnership LP [48.6%] |
Phase II Unit 4 | Fujian Huadian Kemen Power Generation Co Ltd [100%] | China Huadian Group Corp [51.4%]; Ningbo Meishan Free Trade Port Chuangze Equity Investment Partnership LP [48.6%] |
Phase III Unit 5 | Fujian Huadian Furui Energy Development Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Phase III Unit 6 | Fujian Huadian Furui Energy Development Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Project-level coal details
- Permit(s): 2023-06-29, 闽发改网审能源函〔2023〕73号, permit amended for unit 5&6.
Background
The four existing coal-fired units of Fuzhou Kemen power station, totaling 2,400 MW. In January 2005, China National Development and Reform Commission (NDRC) granted permission (发改能源〔2005〕791号) to build phase one Kemen coal-fired power plant with two supercritical units. Two units in phase I went online in 2006, followed by phase II two units in 2008.[1][2]
Description of Expansion
Huadian proposed to build two additional coal-fired units at this plant, with a total planned capacity of 2,000 MW. The new units were scheduled to be completed in 2016.[3][4][1]
The proposed units were permitted in 2015. They were planned for commissioning in 2018.[5]
2017: Expansion postponed by government
In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[6]
Fuzhou Kemen power station Units 5-6 are among the postponed coal-burning units,[6] and also appeared on an updated list of postponements released in September 2017.[7]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
Plans revived
With no updates in years, the units were presumed cancelled.
However, in 2022, the expansion was listed in the province's 14th Five-Year-Plan for energy and considered revived.[8] In December 2022, the China Electricity Council reported that construction of the project had resumed.[9] In January 2023, it was reported that construction of Phase III was being accelerated in the first quarter of 2023.[10] By May 2023, bidding for the project's two chimneys was underway.[11] Biddings for further EPC tenders were ongoing in July 2023.[12][13]
Plant Details for Existing Phases I & II
- Sponsor: Huadian Fuxin Energy Corp Ltd
- Parent company: Huadian
- Location: Yanqi Village, Kengyuan Town, Lianjiang County, Fuzhou Prefecture, Fujian Province, China
- Coordinates: 26.3733242, 119.7622253 (exact)
- Status:
- Phases I and II: Operating
- Phase III: Construction
- Gross capacity: 4,400 MW (Operating Units 1-4: 600 MW); (Construction Units 5 & 6: 1,000 MW)
- Type:
- Phases I & II: Supercritical
- Phase III: Ultra-Supercritical
- In service: 2006 (Units 1 & 2); 2008 (Units 3 & 4)
- Coal type:
- Coal source: Phase III: Bituminous
- Source of financing: Phase III: 4.15 billion yuan[4]
Articles and Resources
References
- ↑ 1.0 1.1 “福建华电可门电厂三期工程环境影响评价信息公示(第二次,” 福建日报, 2014-04-17
- ↑ "福建可门电厂一期工程项目变更核准内容的批复". BJX. 2020-01-22. Retrieved 2022-02-02.
- ↑ Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
- ↑ 4.0 4.1 "福建可门电厂二期工程已获核准," accessed June 2013
- ↑ "华电可门三期2×1000MW清洁高效火电项目获核准," 来源:北极星电力网, 2015/11/19
- ↑ 6.0 6.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ 福建省“十四五”能源发展专项规划印发:加强应急备用和调峰电源建设, BJX, 2022-06-02
- ↑ 中国华电:“风光水火”齐推进 助力经济回稳回暖 China Electricity Council, 2022-12-30
- ↑ 福建:推进漳州核电1—2号、华电可门三期等大型电力项目加快建设 BJX, 2023-01-05
- ↑ 【项目】火电|2×1000MW!华电可门三期烟囱钛-钢复合板采购招标/2×1000MW!江西赣能上高清洁煤电环境影响报告书批复 MP Weixin, 2023-05-15
- ↑ 福建华电可门三期2×1000MW煤电项目相关的3项招标 BJX, 2023-06-27
- ↑ "中国电建中标华电可门三期2×1000MW煤电项目!". 北极星电力网. 2023-07-27. Retrieved 2023-9-8.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.