GASEB Pipeline

From Global Energy Monitor
[español] 

The GASEB Pipeline (also known as the Gasoduto Atalaia - Catu) is an operating gas pipeline in northeastern Brazil.

Location

The GASEB pipeline runs from Petrobras's Catu compressor station in Pojuca (Bahia state) to the Base de Operações Atalaia near Aracaju (Sergipe state). At Catu it intersects with the Gasene Gas Pipeline and the Catu Itaporanga Gas Pipeline.[1]

Loading map...

Project Details

  • Operator: Transportadora Associada de Gás S.A.[1]
  • Parent company: Engie (65%), CDPQ (Caisse de dépôt et placement du Québec) (35%)[2]
  • Capacity: 1,400,000 m³/day (0.51 bcm/year)[3]
  • Length: 225 kilometers[3]
  • Diameter: 14 inches[3]
  • Status: Operating[3]
  • Start Year: 1974[4]
  • Associated infrastructure:

Articles and resources

References

  1. 1.0 1.1 "Sistema de Transporte – TAG". ntag.com.br. Retrieved 2021-06-15.{{cite web}}: CS1 maint: url-status (link)
  2. "Transportadora Associada de Gás - TAG". Engie. Retrieved 2022-08-04.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 3.3 "AUTORIZAÇÃO Nº 528, DE 30 DE JULHO DE 2020". Ministério de Minas e Energia. July 31, 2020.{{cite web}}: CS1 maint: url-status (link)
  4. "Relação dos Gasodutos de Transporte Autorizados (Nordeste)". ANP. November 29, 2011.{{cite web}}: CS1 maint: url-status (link)

Related SourceWatch articles

External resources

External articles