Garcia 2 solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Vena Garcia, Currimao solar farm

Garcia 2 solar farm is an operating solar photovoltaic (PV) farm in Curriamo, Ilocos Norte, Philippines.

Project Details

Table 1: Phase-level project details for Garcia 2 solar farm

Status Commissioning year Nameplate capacity Technology Owner
Operating[1] 2023[1] 68 MW[2] PV[2] MERALCO PowerGen CORP (MGen) [100%][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Garcia 2 solar farm

Location Coordinates (WGS 84)
Curriamo, Ilocos Norte, Philippines[2] 18.0152, 120.4949 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://solarquarter.com/2023/04/01/mgreen-and-vena-energy-inaugurates-68-mw-garcia-2-solar-project-in-ilocos-norte/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 (PDF) https://web.archive.org/web/20240201133901/https://www.mpic.com.ph/wp-content/uploads/IR/MPIC-IR-2022.pdf. Archived from the original (PDF) on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20230710153544/http://mb.com.ph/2023/3/30/m-green-vena-energy-start-solar-project-commercial-operation. Archived from the original on 10 July 2023. {{cite web}}: Missing or empty |title= (help)