Gardabani Combined Cycle power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Gardabani Combined Cycle power station (გარდაბნის თბოელექტროსადგური) is an operating power station of at least 485-megawatts (MW) in Gardabani, Kvemo Kartli, Georgia with multiple units, some of which are not currently operating. It is also known as Gardabani 4 thermal power plant (Unit 4), Гардабанская теплоэлектростанция 2 (Unit 2), 3-Thermal (Unit 3), Гардабанская теплоэлектростанция 4 (Unit 4), Гардабанская теплоэлектростанция 1 (Unit 1), Gardabani 3 thermal power plant (Unit 3), Gardabani CCGT (Units 1, 2), Gardabani CCGT 2 (Unit 3), Гардабанская теплоэлектростанция 3 (Unit 3).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Gardabani Combined Cycle power station | Gardabani, Kvemo Kartli, Georgia | 41.460003, 45.053716 (exact)[1][2][3] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, 3, 4: 41.460003, 45.053716
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[4][5][6] | fossil gas: natural gas[5] | 230[4][7] | combined cycle[6][7] | not found | 2015[5][7][6][8][4] |
2 | Operating[4][9][10][11] | fossil gas: natural gas[12] | 255[4][9][13] | combined cycle[9] | not found | 2020[4][9] |
3 | Pre-construction[14][15][16][17][18][19][20] | fossil gas: natural gas[14][21] | 400[14][22][4][1][19] | combined cycle[4][23][6] | not found | 2027 (planned)[14][19][22] |
4 | Pre-construction[22][24] | fossil gas: natural gas[22][24] | 250[22][24] | combined cycle[23] | not found | 2025 (planned)[22][24] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Gardabani TPP 1 LLC [100%][9][25][26] | Georgian Oil and Gas Corporation JSC [51.0%]; Georgian Development Fund JSC [49.0%] |
2 | Gardabani TPP 2 LLC [100%][12][25] | Georgian Oil and Gas Corporation JSC [100.0%] |
3 | Gardabani TPP 3 LLC [100%][18][27] | Georgian Oil and Gas Corporation JSC [100.0%] |
4 | Georgian Oil and Gas Corporation JSC [100%][22][24] | Georgian Oil and Gas Corporation JSC [100.0%] |
Financing
| JSC Georgian Oil and Gas Corporation[51.0%]; JSC Partnership Fund[49.0%][28][29][30][31]
Background
The Gardabani 1 plant was commissioned by Turkish company ÇALIK ENERJI for USD 220 million, and the Gardabani 2 plant was built by Chinese firm China Tianchen Engineering Corporation for USD 180 million.[32]
The tender for the construction of unit 3 (the Gardabani 3 thermal power plant) was announced in 2020[33], and in November 2020, the State Procurement Agency was informed that it had been won by the Turkish company ÇALIK ENERJİ. However, in 2021 the company said that the bid of ÇALIK ENERJİ was rejected. It is unknown when the new details of the tenders for Gardabani 4 and Gardabani 3 thermal power plants will be announced. According to the report submitted by the government to the parliament, the work on feasibility studies for the Gardabani 3 and Gardabani 4 thermal power plant projects has already been completed. The total capacity of units 3 and 4 should be 500 MW with each unit having the capacity of approximately 250 MW.[32][34]
Unit 3 is also referred to as the "Gardabani 3 thermal power plant" or "Gardabani 3 TPP" (Гардабанская теплоэлектростанция 3) and Unit 4 as the "Gardabani 4 thermal power plant" (Гардабанская теплоэлектростанция 4). The construction of the new power plants will take place right next to the existing generation facilities.[32]
On May 2023, the government of Georgia announced an auction for construction of the Gardabani 3 TPP. The government also approved alienation of 100% of shares owned by GOGC in Gardabani 3 TPP LLC for the purpose of attraction of private investments/investors. One of the necessary preconditions for alienation of shares is commissioning of the TPP within the period of 4 years (by 2027). Initially, it was planned to construct 272 MW combined cycle TPP-3 in Gardabani Municipality, however, considering the tendency of significant increase of electricity consumption and deficit of generation sources, the question of construction and commissioning of a thermal power plant with a higher capacity (350-430 MW) in the nearest future was put on the agenda.[35] The "10-year network development plan of Georgia 2023-2033" released in March 2023 lists the plant as "prospective" with the installed capacity of 400 MW. Gardabani 4 TPP was not mentioned in the document.[36]
In November 2023, it was reported that the auction for the construction of the plant had been postponed for the third time. The state is in search of an investor willing to acquire 100% of shares of Gardabni 3 TPP and take on the responsibility of building the thermal power plant. The initial deadline for the auction was August 31, 2023, but it was rescheduled three times. The most recent extension designates January 15, 2024 as the new deadline for the submission of proposals.[37]
In January 2024, the tender announced for the Gardabani 3 TPP was extended for the fourth time to February 29, 2024.[38] As of November 2024, there have not been any further updates.
Gardabani 4 TPP was last mentioned in the media in June 2022.[32] The project is considered to be shelved.
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20210803215552/https://mepa.gov.ge/Ge/Files/ViewFile/39101. Archived from the original on 03 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/Gardabani+1+CCPP,+Georgia/@41.4556272,45.0469593,1889m/data=!3m1!1e3!4m9!1m2!2m1!1sgardabani+power+station+georgia!3m5!1s0x0:0x5200fa6a9efed8b2!8m2!3d41.461877!4d45.0539825!15sCh9nYXJkYWJhbmkgcG93ZXIgc3RhdGlvbiBnZW9yZ2lhWiEiH2dhcmRhYmFuaSBwb3dlciBzdGF0aW9uIGdlb3JnaWGSARZwb3dlcl9wbGFudF9jb25zdWx0YW50mgEkQ2hkRFNVaE5NRzluUzBWSlEwRm5TVU5CTmt4SFFuZFJSUkFC.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/Gardabani+Combined+Cycle+Power+Plant+2/@41.460166,45.0558751,13z/data=!4m9!1m2!2m1!1sGardabani+Power+Station+2+georgia!3m5!1s0x0:0x1436bee4b0292d5a!8m2!3d41.4594303!4d45.0525979!15sCiFHYXJkYWJhbmkgUG93ZXIgU3RhdGlvbiAyIGdlb3JnaWGSAQtwb3dlcl9wbGFudA.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20240108211018/https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF. Archived from the original (PDF) on 08 January 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20210803215330/https://eng.calikenerji.com/Pages/ProjectDetail.aspx?ID=33. Archived from the original on 03 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 (PDF) https://web.archive.org/web/20220120110340/http://weg.ge/sites/default/files/book_4_25_21.03.2020.pdf. Archived from the original (PDF) on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 (PDF) https://web.archive.org/web/20220922092337/http://www.economy.ge/uploads/files/2017/energy/security_of_supply_statement_electricity/security_of_supply_statement_electricity_2021_eng.pdf. Archived from the original (PDF) on 22 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221210030843/https://www.gogc.ge/ka/article/gardabnis-tboeleqtrosadguri-gaixsna/155. Archived from the original on 10 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 https://web.archive.org/web/20220926095243/https://www.gogc.ge/en/project/gardabani-power-plant-2/32/. Archived from the original on 26 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220808035910/https://agenda.ge/en/news/2020/151. Archived from the original on 08 August 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210803215628/http://gbc.ge/index.php?m=home&newsid=112320&lang=geo. Archived from the original on 03 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20210803220805/https://www.flenco.com/index.php/projects/145-erzin-combined-cycle-power-plant-86. Archived from the original on 03 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20230422090409/http://www.gse.com.ge/sw/static/file/TYNDP_GE-2022-2032_ENG.pdf. Archived from the original (PDF) on 22 April 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 https://web.archive.org/web/20210803220522/https://commersant.ge/ge/post/shuaxevi-hesze-45-it-umfro-mdzlavri-tboeleqtrosadguris-mshenebloba-2023-wels-dasruldeba. Archived from the original on 03 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240108211050/https://www.gogc.ge/uploads/tinymce/documents/RFP%20Documentation%20-%2030.06.23_Final.pdf. Archived from the original (PDF) on 08 January 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240507061636/https://gbc.ge/en/news/Economics-news/gardabani-3-still-does-not-have-an-investor. Archived from the original on 07 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20230104111111/https://www.gogc.ge/uploads/files/633c1a0975d75.pdf. Archived from the original (PDF) on 04 January 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 18.0 18.1 https:///third-postponement-gardabani-thermal-power-plant-auction-deadline-extended-to-january-15-2024/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 https://www.gogc.ge/en/article/auction-to-be-announced-for-construction-of-gardabani-3-tpp/582.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220709174500/http://interfax.az/view/811506. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20210803215430/https://www.gogc.ge/uploads/tinymce/documents/RFP%20Documentation_Rev_03.pdf. Archived from the original (PDF) on 03 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 22.0 22.1 22.2 22.3 22.4 22.5 22.6 https://web.archive.org/web/20221127062805/https://bm.ge/en/article/ra-dziritadi-riskebi-rcheba-finansuri-seqtoristvis---papuna-lejava/91995. Archived from the original on 27 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 https://web.archive.org/web/20221104033242/https://sputnik-georgia.ru/20220603/novshestva-energetiki-novye-tets-i-ges-v-gruzii-267091996.html. Archived from the original on 04 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 24.0 24.1 24.2 24.3 24.4 https://web.archive.org/web/20220709174621/https://bm.ge/en/article/mtavrobam-sabajoze-saeqsporto-gvinis-monitoringistvis-sgs-i-daiqirava---chatarda-198-inspeqcia/110136. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 25.0 25.1 https://web.archive.org/web/20221009025556/https://www.gogc.ge/en/companies/subsidiary-companies. Archived from the original on 09 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221025144756/https://www.power-technology.com/projects/gardabani-combined-cycle-thermal-power-plant-kvemo-kartli/. Archived from the original on 25 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210803215401/https://cbw.ge/business/the-oil-and-gas-corporation-plans-to-build-another-thermal-power-plant. Archived from the original on 03 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "investingeorgia.org/en/keysectors/energy/access-to-finance/jsc-partnership-fund". Archived from the original on August 3, 2021.
- ↑ "www.gogc.ge/en/about-overview". Archived from the original on August 3, 2021.
- ↑ "www.gogc.ge/en/companies/subsidiary-companies/". Archived from the original on August 3, 2021.
- ↑ "www.power-technology.com/projects/gardabani-combined-cycle-thermal-power-plant-kvemo-kartli/". Archived from the original on August 3, 2021.
- ↑ 32.0 32.1 32.2 32.3 "Gov't Plans To Build A New Gardabani 4 Thermal Power Plant". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
- ↑ "Грузия ищет подрядчика для строительства в Гардабани третьей комбинированной ТЭС". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
- ↑ "Gov't Plans To Build A Thermal Power Plant 'Gardabani 4'". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
- ↑ "Auction to be announced for construction of Gardabani-3 TPP". Georgian Oil & Gas Corporation. May 29, 2023. Retrieved June 30, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ten-Year Network Development Plan of Georgia 2023-2033" (PDF). Georgian State Electrosystem. March 20, 2023. Retrieved December 13, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Third Postponement: Gardabani Thermal Power Plant Auction Deadline Extended to January 15, 2024". georgiatoday.ge. November 24, 2023. Retrieved December 13, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ ""Gardabani 3" still does not have an investor". Georgian Business Consulting. January 12, 2024. Retrieved April 18, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.