Garrido Solar Cluster

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Garrido Solar Cluster is a solar photovoltaic (PV) farm under construction in Setúbal, Portugal.

Project Details

Table 1: Phase-level project details for Garrido Solar Cluster

Phase name Status Nameplate capacity Technology Owner Operator
Alcochete Construction[1] 23.8 MW[1] PV[1] Voltalia SA[1] Voltalia SA[1]
Antuzede Construction[1] 11.4 MW[1] PV[1] Voltalia SA[1] Voltalia SA[1]
Oliveira de Frades Construction[1] 1.2 MW[1] PV[1] Voltalia SA[1] Voltalia SA[1]
Pinhal Novo Construction[1] 11.8 MW[1] PV[1] Voltalia SA[1] Voltalia SA[1]
Vale Serrao Construction[1] 2.4 MW[1] PV[1] Voltalia SA[1] Voltalia SA[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Garrido Solar Cluster

Phase Name Location Coordinates (WGS 84)
Alcochete Setúbal, Portugal[1] 38.7212, -8.8706 (approximate)[1]
Antuzede Coimbra, Coimbra, Portugal[1] 40.2530, -8.4754 (approximate)[1]
Oliveira de Frades Viseu, Portugal[1] 40.7128, -8.2186 (approximate)[1]
Pinhal Novo Setúbal, Portugal[1] 38.6568, -8.8783 (approximate)[1]
Vale Serrao Coimbra, Portugal[1] 40.0091, -7.9580 (approximate)[1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 https://www.pv-magazine.es/2022/09/23/voltalia-inicia-la-construccion-de-506-mw-en-portugal/. {{cite web}}: Missing or empty |title= (help)