Gatton to Gympie Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Gatton to Gympie Pipeline was a proposed gas pipeline in Australia. There is no evidence that the pipeline was constructed, and it is presumed to be cancelled as of 2006.

Location

The pipeline would have run from the Roma to Brisbane Pipeline near Gatton to Gympie in Queensland, Australia.

Loading map...

Project details

  • Operator: Allgas Pipelines Operations Pty Ltd[1]
  • Owner: Allgas Energy Pty Ltd[2]
  • Parent company: Energex[3], later acquired by APA Group
  • Capacity:
  • Length: 200 kilometers[4]
  • Diameter: 4, 6, 8 inches[4]
  • Status: Cancelled
  • Start year:
  • Cost:

Background

According to information on construction activity, the pipeline was proposed in 2001 but was deferred in 2006.[5] There is no evidence for further development of the pipeline since, and it is presumed to be cancelled as of 2006.

Articles and resources

References

  1. "APA agrees to buy Allgas from Energex". The Sydney Morning Herald. 2006-10-03. Retrieved 2022-02-04.
  2. "The Allgas Distribution Business (slideshow)" (PDF). APA Group. 2006-10-03. Retrieved 2022-02-04.{{cite web}}: CS1 maint: url-status (link)
  3. "APA agrees to buy Allgas from Energex". The Sydney Morning Herald. 2006-10-03. Retrieved 2022-02-04.
  4. 4.0 4.1 "GATTON TO GYMPIE GAS PIPELINE Project in ., QLD - Cordell Connect". www.cordellconnect.com.au. Retrieved 2022-07-18.
  5. "GATTON TO GYMPIE GAS PIPELINE Project in Gatton, QLD - Cordell Connect". web.archive.org. 2022-02-04. Retrieved 2022-02-04.

Related GEM.wiki articles

External resources

External articles