Gelligaer wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Gelligaer wind farm is a cancelled wind farm in Merthyr Tydfil County Borough, Wales, United Kingdom.

Project Details

Table 1: Phase-level project details for Gelligaer wind farm

Phase name Status Nameplate capacity Type Operator
A Cancelled[1] 10 MW[1] Onshore South Wales Power; SWALEC[1]
B Cancelled[1] 10 MW[1] Onshore South Wales Power; SWALEC[1]

Location

Table 2: Phase-level location details for Gelligaer wind farm

Phase Name Location Coordinates (WGS 84)
A Merthyr Tydfil County Borough, Wales, United Kingdom[1] 51.723, -3.3043 (exact)[1]
B Merthyr Tydfil County Borough, Wales, United Kingdom[1] 51.723, -3.3043 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Archived from the original on June 21, 2021. Retrieved May 24, 2021. {{cite web}}: Check date values in: |date= (help)