Gippsland Renewable Energy Park (GREP) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Gippsland Renewable Energy Park (GREP) solar farm is an announced solar photovoltaic (PV) farm in Giffard West, Gippsland, Victoria, Australia.

Project Details

Table 1: Phase-level project details for Gippsland Renewable Energy Park (GREP) solar farm

Status Nameplate capacity Technology Owner Operator
Announced[1] 500 MW[1] PV[2] SOLIS Renewable Energy (Solis RE) [50%]; Gippsland local business Marathon Group [25%]; Private Owners - Ferguson Family [25%][1] SOLIS Renewable Energy (Solis RE)[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Gippsland Renewable Energy Park (GREP) solar farm

Location Coordinates (WGS 84)
Giffard West, Gippsland, Victoria, Australia[2] -38.3763, 147.0006 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://reneweconomy.com.au/huge-solar-and-battery-park-to-replace-victorian-coal-backed-by-cefc-and-super-fund/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 http://www.solisre.com.au/repowering-gippsland/. {{cite web}}: Missing or empty |title= (help)