Glentanemacelligot wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Glentanemacelligot wind farm is an operating wind farm in Newmarket, Cork, Munster, Ireland.

Project Details

Table 1: Phase-level project details for Glentanemacelligot wind farm

Status Commissioning year Nameplate capacity Type Owner
Operating[1] 2010[1] 15 MW[2] Onshore[2] Greencoat Renewables [100%][3]

Location

Table 2: Phase-level location details for Glentanemacelligot wind farm

Location Coordinates (WGS 84)
Newmarket, Cork, Munster, Ireland[1] 52.2149, -8.9989 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 (PDF) https://web.archive.org/web/20240126140932/https://www.pleanala.ie/anbordpleanala/media/abp/cases/reports/rl3/rrl3531.pdf. Archived from the original (PDF) on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20220221192019/https://www.cru.ie/wp-content/uploads/2020/07/CRU20068-Authorisation-to-Construct.pdf. Archived from the original (PDF) on 21 February 2022. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20240131135120/https://www.greencoat-renewables.com/~/media/Files/G/Greencoat-Renewables/documents/reports-publications/2017/greencoat-renewables-plc-admission-document.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)