Goaltore solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Goaltore solar farm is a solar photovoltaic (PV) farm in pre-construction in Goaltore, West Midnapore, West Bengal, India.

Project Details

Table 1: Phase-level project details for Goaltore solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Pre-construction[1] 2025 (planned)[2] 112.5 MWac[2] PV[3] West Bengal State Electricity Distribution Company (WBSEDCL) [100%][4]
2 Announced[1] 75 MWac[1] PV[3] West Bengal State Electricity Distribution Company (WBSEDCL) [100%][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Goaltore solar farm

Phase Name Location Coordinates (WGS 84)
1 Goaltore, West Midnapore, West Bengal, India[5] 22.7087, 87.1701 (approximate)[5]
2 Goaltore, West Midnapore, West Bengal, India[5] 22.7087, 87.1701 (approximate)[5]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 (PDF) https://web.archive.org/web/20240827152117/https://wberc.gov.in/sites/default/files/435.pdf. Archived from the original (PDF) on 2024-08-27. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://www.wbsedcl.in/irj/go/km/docs/internet/new_website/pdf/Notice%20of%2017th%20Annual%20General%20Meeting%20of%20WBSEDCL%20on%2023.09.2024%20%2018.09.2024.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240207105210/https://www.projectstoday.com/News/WBSEDCL-floats-tender-for-125-MW-solar-park-project. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240201103615/https://www.saurenergy.com/solar-energy-news/200-mw-solar-park-launched-in-west-bengal-by-chief-minister. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 (PDF) https://wberc.gov.in/sites/default/files/435.pdf https://maps.app.goo.gl/Q2uF1G3JzYw8V82o6, https://wberc.gov.in/sites/default/files/435.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)