Golczewo solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: QPV Golczewo

Golczewo solar farm is an operating solar photovoltaic (PV) farm in Kamień County, West Pomeranian Voivodeship, Poland.

Project Details

Table 1: Phase-level project details for Golczewo solar farm

Status Commissioning year Nameplate capacity Technology Owner
Operating[1] 2024[1] 80 MW[2] PV[3] Qair Polska [100%][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Golczewo solar farm

Location Coordinates (WGS 84)
Kamień County, West Pomeranian Voivodeship, Poland[2] 53.8229, 14.9953 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://renews.biz/96123/qair-launches-80mw-solar-farm-in-poland/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240201213745/https://cleanerenergy.pl/2023/01/27/onde-zawarlo-umowy-na-budowe-trzech-farm-pv/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.gramwzielone.pl/energia-sloneczna/109908/onde-z-wielomilionowymi-umowa-na-wykonanie-farm-pv. {{cite web}}: Missing or empty |title= (help)