Golczewo solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: QPV Golczewo
Golczewo solar farm is a solar photovoltaic (PV) farm under construction in Kamień County, West Pomeranian Voivodeship, Poland.
Project Details
Table 1: Phase-level project details for Golczewo solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Construction[1] | 80 MW[2] | PV[3] | Qair Polska [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Golczewo solar farm
Location | Coordinates (WGS 84) |
---|---|
Kamień County, West Pomeranian Voivodeship, Poland[2] | 53.8229, 14.9953 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240219022351/https://www.gramwzielone.pl/energia-sloneczna/20174758/wielkopolska-farma-fotowoltaiczna-na-trackerach-skompletowana. Archived from the original on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240201213745/https://cleanerenergy.pl/2023/01/27/onde-zawarlo-umowy-na-budowe-trzech-farm-pv/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.gramwzielone.pl/energia-sloneczna/109908/onde-z-wielomilionowymi-umowa-na-wykonanie-farm-pv.
{{cite web}}
: Missing or empty|title=
(help)