Gold Dust Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Gold Dust Solar is a solar photovoltaic (PV) farm in pre-construction in Tonopah, Esmeralda County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Gold Dust Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2026 (planned)[1] | 1500 MWac[1] | PV[1] | Arevia Power [100%][1] | Arevia Power[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Gold Dust Solar
Location | Coordinates (WGS 84) |
---|---|
Tonopah, Esmeralda County, Nevada, United States[1] | 37.6996, -117.206 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://web.archive.org/web/20240201184514/https://www.blm.gov/sites/blm.gov/files/docs/2021-09/nv-Gold-Dust-Solar-POD-2021.07.28.pdf. Archived from the original (PDF) on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)