Gopalpur FSRU is a floating storage and regasification unit (FSRU) liquefied natural gas (LNG) import terminal proposed in India.[1]

Location

The terminal is proposed to be located in Gopalpur port, Aryapalli, Odisha, India.[1]

Loading map...

Project details

Phase 1

  • Operator:
  • Owner: Petronet LNG[1]
  • Parent company: Petronet LNG[1]
  • Vessel:
  • Vessel operator:
  • Vessel owner:
  • Vessel parent company:
  • Location: Gopalpur port, Aryapalli, Odisha, India[1]
  • Coordinates: 19.301786, 84.966246 (approximate)
  • Capacity: 4 mtpa[2]
  • Status: Proposed[1]
  • Type: Import[1]
  • Start year: 2025[1]
  • Cost: 23.06 billion rupees (US$285.5 million)(full project Phase 1 and 2)[1]
  • Financing:
  • FID status: FID (2022)[3]
  • Associated infrastructure:

Phase 2

  • Operator:
  • Owner: Petronet LNG[1]
  • Parent company: Petronet LNG[1]
  • Location: Gopalpur port, Aryapalli, Odisha, India[1]
  • Coordinates: 19.301786, 84.966246 (approximate)
  • Capacity: 5 mtpa (total project, not in addition to Phase 1)[1]
  • Status: Proposed[1]
  • Type: Import[1]
  • Start year:
  • Cost: 23.06 billion rupees (US$285.5 million)(full project Phase 1 and 2)[1]
  • Financing:
  • FID status:
  • Associated infrastructure:

Background

In November 2022, Petronet LNG announced that it planned to build an LNG import terminal at Gopalpur port in Odisha, India.[4] The project will be built in two phases: first, a 4-mtpa FSRU will deployed at the site. For the second phase, there is a provision for the facility to be converted to an onshore terminal with a total capacity of 5 mtpa.[1][2] The full project is expected to cost 23.06 billion rupees (US$285.5 million).[1]

In December 2023, it was reported that Petronet LNG was moving forward with its plans for the FSRU. Petronet and Gopalpur Ports signed a sub-concession agreement, sub-lease deed, and port service agreement for the first phase of the terminal.[5]

Articles and resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 LNG Prime Staff (2022-11-11). "India's Petronet LNG approves Gopalpur FSRU project". LNG Prime. Retrieved 2023-10-02.
  2. 2.0 2.1 GIIGNL. The LNG Industry: GIIGNL Annual Report 2023. July 14, 2023.
  3. "Greenfield Indian LNG project gets go-ahead". Upstream Online. Nov 16, 2022. Retrieved Jun 13, 2024.{{cite web}}: CS1 maint: url-status (link)
  4. Infra.com. Petronet LNG to set up floating LNG terminal at Gopalpur. December 15, 2022.
  5. "India's Petronet LNG moves forward with Gopalpur FSRU plans". LNGPrime. Dec 29, 2023. Retrieved Jun 13, 2024.{{cite web}}: CS1 maint: url-status (link)