Goyder South wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Stony Gap (Phase 0)
Goyder South wind farm is a wind farm in pre-construction in Burra, South Australia, Australia.
Project Details
Table 1: Phase-level project details for Goyder South wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
0 | Cancelled[1] | – | 109 MW[1] | Onshore[1] | Palisade Investment Partners LLC; Neoen[1][2][1][2] | Neoen[1] |
1A | Construction[3] | 2024 (planned)[4] | 209 MW[5] | Onshore[4] | Neoen [100%][2] | Neoen[2] |
1B | Construction[6] | – | 204 MW[5] | Onshore[4] | Neoen [100%][2] | Neoen[2] |
2 | Pre-construction[6] | 2027 (planned)[2] | 400 MW[2] | Onshore[4] | Neoen [100%][2] | Neoen[2] |
3 | Announced[2] | 2027 (planned)[2] | 400 MW[2] | Onshore[4] | Neoen [100%][2] | Neoen[2] |
Location
Table 2: Phase-level location details for Goyder South wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
0 | Burra, South Australia, Australia[1][7] | -33.6714, 138.9301 (approximate)[1][7] |
1A | Burra, South Australia, Australia[7] | -33.7442, 138.9809 (approximate)[7] |
1B | Burra, South Australia, Australia[6] | -33.7702645, 138.9076198 (approximate)[6] |
2 | Burra, South Australia, Australia[7] | -33.7442, 138.9809 (approximate)[7] |
3 | Burra, South Australia, Australia[7] | -33.7442, 138.9809 (approximate)[7] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20240126064022/https://e.infogram.com/6db58cec-3c1b-4900-8f9e-e0969678b51d?parent_url=https%3A%2F%2Fwww.spglobal.com%2Fmarketintelligence%2Fen%2Fnews-insights%2Fblog%2Finfographic-the-big-picture-2024-energy-transition-outlook&src=embed. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 (PDF) https://web.archive.org/web/20240125152627/https://www.ecogeneration.com.au/wp-content/uploads/2021/01/WindMap-202102.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126152137/https://neoen.com/en/news/2023/neoen-completes-financing-for-the-first-209-mw-of-its-goyder-wind-farm-in-south-australia/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240126113020/https://neoen.com/en/news/2022/neoen-gives-go-ahead-on-412-mw-wind-farm-first-stage-of-its-goyder-renewables-zone-in-south-australia/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20220320195029/https://www.industry.gov.au/sites/default/files/aip/goyder_wind_farm_1_aipp_draft_summary.pdf. Archived from the original (PDF) on 20 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20240126152137/https://goyderenergy.com.au/goyder-south/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 (PDF) https://web.archive.org/web/20210313043511/https://goyderenergy.com.au/wp-content/uploads/2020/01/Client-Questionnaire-2014.pdf. Archived from the original (PDF) on 13 March 2021.
{{cite web}}
: Missing or empty|title=
(help)