Gračanica solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Bugojno, FNE Gracania 2 (Phase 2), FNE Gracania 1 (Phase 1)

Gračanica solar farm is a solar photovoltaic (PV) farm in pre-construction in Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina.

Project Details

Table 1: Phase-level project details for Gračanica solar farm

Phase name Status Nameplate capacity Technology Owner
1 Pre-construction[1] 25 MWp/dc[1] PV[1] Elektroprivreda Bosne i Hercegovine (EPBiH) [100%][1]
2 Pre-construction[1] 25 MWp/dc[1] PV[1] Elektroprivreda Bosne i Hercegovine (EPBiH) [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Gračanica solar farm

Phase Name Location Coordinates (WGS 84)
1 Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina[1] 44.6961, 18.3032 (approximate)[1]
2 Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina[1] 44.6961, 18.3032 (approximate)[1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 https://web.archive.org/web/20240201200509/https://www.pv-magazine.com/2022/07/19/bosnian-utility-to-deploy-50-mw-of-solar-on-coal-waste-site/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)