Gračanica solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Bugojno, FNE Gracania 2 (Phase 2), FNE Gracania 1 (Phase 1)
Gračanica solar farm is a solar photovoltaic (PV) farm in pre-construction in Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina.
Project Details
Table 1: Phase-level project details for Gračanica solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
1 | Pre-construction[1] | 25 MWp/dc[1] | PV[1] | Elektroprivreda Bosne i Hercegovine (EPBiH) [100%][1] |
2 | Pre-construction[1] | 25 MWp/dc[1] | PV[1] | Elektroprivreda Bosne i Hercegovine (EPBiH) [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Gračanica solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina[1] | 44.6961, 18.3032 (approximate)[1] |
2 | Town of Gračanica, Tuzla Canton, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina[1] | 44.6961, 18.3032 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 https://web.archive.org/web/20240201200509/https://www.pv-magazine.com/2022/07/19/bosnian-utility-to-deploy-50-mw-of-solar-on-coal-waste-site/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)