Grand Meadow wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Ben Fowke Wind Energy Center
Grand Meadow wind farm is an operating wind farm in Mower County, Minnesota, United States.
Project Details
Table 1: Phase-level project details for Grand Meadow wind farm
Phase name | Status | Commissioning year | Retired year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|---|
1 | Operating[1] | 2008[2] | 2025[3] | 100 MW[2] | Onshore[2] | Xcel Energy Inc [100%][4] | enXco Development[4] |
RP1 | Pre-construction[5] | 2025 (planned)[3] | – | 120 MW[6] | Onshore[6] | Xcel Energy Inc [100%][4] | enXco Development[4] |
Location
Table 2: Phase-level location details for Grand Meadow wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Mower County, Minnesota, United States[2] | 43.7066, -92.6954 (exact)[2] |
RP1 | Mower County, Minnesota, United States[2] | 43.7066, -92.6954 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ 3.0 3.1 "Power plant profile: Grand Meadows-Repowered, US". 2023-04-29. Archived from the original on 2024-09-20. Retrieved 2024-08-19.
- ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240131012831/https://www.edockets.state.mn.us/EFiling/edockets/searchDocuments.do?method=showPoup&documentId=%7BB13A8A13-FF6F-42A5-B2D7-CBBC0A4C5DD5%7D&documentTitle=20112-59852-02. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126123120/https://fillmorecountyjournal.com/minnesota-public-utilities-commission-approves-repowering-of-the-grand-meadow-wind-farm-in-mower-county/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240125180050/https://www.wind-watch.org/news/2021/01/17/xcel-looking-to-upgrade-grand-meadow-wind-farm/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help)