Grati power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Grati power station is an operating power station of at least 1356-megawatts (MW) in Pasir Panjang, East Java, Indonesia. It is also known as Perak-Grati Generation Unit.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Grati power station Pasir Panjang, East Java, Indonesia -7.6517, 113.0244 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2, 3-1: -7.6517, 113.0244

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Operating[3][4][5] fossil gas: natural gas, fossil liquids: fuel oil[6] 456[7] combined cycle[8] not found 1997[8]
2 Operating[3][4][5] fossil gas: natural gas[9][10] 450[10][11][12][5] combined cycle[10][5] not found 2020[12]
3-1 Operating[3][4][5] fossil gas: natural gas[1] 450[1] combined cycle[1] not found 2019[1]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 PT Indonesia Power [100%][13][14][15][16] PT PLN (Persero) [100.0%]
2 PT Indonesia Power [100%][13][14][15][16] PT PLN (Persero) [100.0%]
3-1 PT Indonesia Power [100%][13][14][15][16] PT PLN (Persero) [100.0%]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20210310163544/https://petrominer.com/kebut-proyek-35-000-mw-pltgu-grati-blok-iii-diresmikan/. Archived from the original on 2021-03-10. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125091319/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 (PDF) https://www.plnindonesiapower.co.id/id/komunikasi-berkelanjutan/Reports/STATISTIC%20REPORT%20PT%20INDONESIA%20POWER%20TAHUN%202021.pdf. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 (PDF) https://web.archive.org/web/20210621185003/https://www.indonesiapower.co.id/id/komunikasi-berkelanjutan/Reports/CompanyProfile.pdf. Archived from the original (PDF) on 2021-06-21. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 (PDF) https://indonesiapower.co.id/reports/annual-report/ar-indonesia-power-2021/files/downloads/AR-IP-2021.pdf. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20221004014156/https://www.indonesiapower.co.id/id/produk-dan-layanan/produk/Pages/Grati%20POMU.aspx. Archived from the original on 2022-10-04. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://web.archive.org/web/20221228142301/https://repit.files.wordpress.com/2013/03/gbu-ip-pltgu-grati-perak-grati.pdf. Archived from the original (PDF) on 2022-12-28. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 (PDF) https://web.archive.org/web/20221224153843/https://openjicareport.jica.go.jp/pdf/11838976_02.pdf. Archived from the original (PDF) on 2022-12-24. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20210614190455/https://www.flenco.com/index.php/projects/142-erzin-combined-cycle-power-plant-83. Archived from the original on 2021-06-14. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 (PDF) https://web.archive.org/web/20230130230943/https://johncockerill.com/wp-content/uploads/2020/04/John-Cockerill_Energy_HRSG_GRATI-II.pdf. Archived from the original (PDF) on 2023-01-30. {{cite web}}: Missing or empty |title= (help)
  11. (PDF) https://web.archive.org/web/20220709130958/https://web.pln.co.id/statics/uploads/2021/06/31c.SummaryReportLampiranStatusMei21-EKSTERNAL.pdf. Archived from the original (PDF) on 2022-07-09. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 https://web.archive.org/web/20220709132324/https://www.dunia-energi.com/pemerintah-dorong-pln-lobi-ipp-mundurkan-penyelesaian-proyek-35-ribu-mw/. Archived from the original on 2022-07-09. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 (PDF) https://web.archive.org/web/20221226150403/https://repit.files.wordpress.com/2013/03/gbu-ip-semarang1.pdf. Archived from the original (PDF) on 2022-12-26. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 https://web.archive.org/web/20220709143820/https://www.power-technology.com/marketdata/grati-combined-cycle-power-plant-block-i-indonesia/. Archived from the original on 2022-07-09. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 (PDF) https://web.archive.org/web/20170207092750/http://datacenter.bappedakaltim.com/data/musrenbangreg/10%202016-03-08-Perspektif-Pengembangan-Sistem-Ketenagalistrikan.pdf. Archived from the original (PDF) on 2017-02-07. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 https://web.archive.org/web/20220810142956/https://www.power-technology.com/marketdata/grati-combined-cycle-power-plant-block-iii-indonesia/. Archived from the original on 2022-08-10. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.