Gravier wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Gravier wind farm (Projeto Eólico Gravier) is an operating wind farm in Icapuí, Região Geográfica Intermediária de Quixadá, Ceará, Brazil.
Project Details
Table 1: Phase-level project details for Gravier wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2022[2] | 71 MW[1] | Onshore[1] | Aliança Energia [100%][2] | Aliança Energia[2] |
Location
Table 2: Phase-level location details for Gravier wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Icapuí, Região Geográfica Intermediária de Quixadá, Ceará, Brazil[1] | -4.7553, -37.3363 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20211106131543/https://aliancaenergia.com.br/br/inicio-das-obras-do-projeto-eolico-gravier/. Archived from the original on 06 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)