Great Divide wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Great Divide wind farm is a cancelled wind farm in Grant County, New Mexico, United States.

Project Details

Table 1: Phase-level project details for Great Divide wind farm

Phase name Status Nameplate capacity Type Owner
1 Cancelled (inferred September 2024) 250 MW[1] Onshore[1] Scout Clean Energy LLC [100%][1]

Location

Table 2: Phase-level location details for Great Divide wind farm

Phase Name Location Coordinates (WGS 84)
1 Grant County, New Mexico, United States[1] 32.3798, -108.4520 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125180055/https://www.scoutcleanenergy.com/projects/great-divide/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)