Gryf solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Gryf solar farm is an operating solar photovoltaic (PV) farm in Przykona, Przykona Gmina, Przykona County, Greater Poland, Poland.
Project Details
Table 1: Phase-level project details for Gryf solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2022[2] | 20 MW[3] | PV[1] | Energa OZE SA [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Gryf solar farm
Location | Coordinates (WGS 84) |
---|---|
Przykona, Przykona Gmina, Przykona County, Greater Poland, Poland[1] | 52.0107, 18.6301 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240207131041/https://energagreendevelopment.pl/aktualnosci/761637/kolejny-etap-rozbudowy-farmy-pv-gryf. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206165445/https://www.portalsamorzadowy.pl/finanse/wiceminister-klimatu-widzimy-mala-przestrzen-na-kolejne-zobowiazania-redukcyjne,522268.html. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240201213652/https://grupa.energa.pl/en/publications/524505/stable-foundations-for-energa-group-despite-difficult-conditions-in-2019. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)