Guangdong Huizhou New Material Industrial Park power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Guangdong Huizhou New Material Industrial Park power station (惠州新材料产业园热电冷联产项目) is a power station under construction in Baihua Town, Lianfeng Village, Huidong County, Huizhou, Guangdong, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Guangdong Huizhou New Material Industrial Park power station | Baihua Town, Lianfeng Village, Huidong County, Huizhou, Guangdong, China | 22.903105, 114.612131 (exact)[1][2][3] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2: 22.903105, 114.612131
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Construction[4] | fossil gas: natural gas[5][6][7][8][3] | 460[5] | combined cycle[5] | yes[5] | 2026 (planned)[9] |
2 | Construction[4] | fossil gas: natural gas[5][6][7][8][3] | 460[5] | combined cycle[5] | yes[5] | 2026 (planned)[9] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Guangdong Yuedian Huixin Thermal Power Co Ltd [100%][5][3] | Guangdong Electric Power Development Co Ltd [85.0%]; Huidong County Public Utility Development Group Co Ltd [7.5%]; Huizhou Industrial Investment Group Co Ltd [7.5%] |
2 | Guangdong Yuedian Huixin Thermal Power Co Ltd [100%][5][3] | Guangdong Electric Power Development Co Ltd [85.0%]; Huidong County Public Utility Development Group Co Ltd [7.5%]; Huizhou Industrial Investment Group Co Ltd [7.5%] |
Background
In August 2023, this project received approval from the Huizhou Municipal Energy and Key Projects Bureau.[10] This project is scheduled to commence operation in 2025.[11]
Articles and Resources
References
- ↑ "惠州新材料产业园从荒山野岭变发展沃土_惠州新闻网". www.hznews.com. 2024-01-05. Archived from the original on 2024-05-08. Retrieved 2024-04-26.
- ↑ https://landchina.mnr.gov.cn/land/jggg/gpcr1/202210/t20221026_8384312.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://archive.org/details/screenshot-2023-05-09-at-1.30.53-pm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.geg.com.cn/gdyd/xwzx/jcdt/content/post_17425.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 "粤电力A(000539.SZ):惠州新材料产业园热电冷联产项目获得核准 总投资估算约为26.26亿元". www.163.com. 2023-08-26. Archived from the original on 2024-05-08. Retrieved 2024-04-26.
- ↑ 6.0 6.1 "广东省发展和改革委员会 - 广东省能源局关于惠州新材料产业园热电冷联产项目节能报告的审查意见". drc.gd.gov.cn. 2023-11-06. Archived from the original on 2024-04-27. Retrieved 2024-04-26.
- ↑ 7.0 7.1 "2×460MW!惠州新材料产业园热电冷联产项目获得核准-北极星电力新闻网". m.bjx.com.cn. 2023-09-01. Archived from the original on 2024-05-08. Retrieved 2024-04-26.
- ↑ 8.0 8.1 "广东公布2024年重点建设项目计划清单,总投资约8.1万亿-我的钢铁网". m.mysteel.com. 2024-03-29. Archived from the original on 2024-05-08. Retrieved 2024-04-26.
- ↑ 9.0 9.1 http://www.huizhou.gov.cn/zwgk/hzsz/zwyw/content/mpost_5344908.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "2×460MW!惠州新材料产业园热电冷联产项目获得核准". 2023-09-01. Retrieved 2023-10-25.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "广东省发展改革委关于下达广东省2023年重点建设项目计划的通知". 2023-03-20. Retrieved 2023-10-25.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.