Guangdong Huizhou Pinghai power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Guangdong Huizhou Pinghai power station (粤电广东惠州平海发电厂) is an operating power station of at least 2000-megawatts (MW) in Pinghai, Huidong, Huizhou, Guangdong, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Guangdong Huizhou Pinghai power station | Pinghai, Huidong, Huizhou, Guangdong, China | 22.6064638, 114.741919 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 22.6064638, 114.741919
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: unknown | 1000 | ultra-supercritical | 2010 |
Phase I Unit 2 | operating | coal: unknown | 1000 | ultra-supercritical | 2011 |
Phase II Unit 3 | cancelled | coal: unknown | 1000 | ultra-supercritical | – |
Phase II Unit 4 | cancelled | coal: unknown | 1000 | ultra-supercritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Guangdong Huizhou Pinghai Power Plant Co Ltd [100%] | Guangdong Hanjian Holding Co Ltd [54.4%]; Guangdong Electric Power Development Co Ltd [45.0%]; other [0.6%] |
Phase I Unit 2 | Guangdong Huizhou Pinghai Power Plant Co Ltd [100%] | Guangdong Hanjian Holding Co Ltd [54.4%]; Guangdong Electric Power Development Co Ltd [45.0%]; other [0.6%] |
Phase II Unit 3 | Guangdong Huizhou Pinghai Power Plant Co Ltd [100%] | Guangdong Hanjian Holding Co Ltd [54.4%]; Guangdong Electric Power Development Co Ltd [45.0%]; other [0.6%] |
Phase II Unit 4 | Guangdong Huizhou Pinghai Power Plant Co Ltd [100%] | Guangdong Hanjian Holding Co Ltd [54.4%]; Guangdong Electric Power Development Co Ltd [45.0%]; other [0.6%] |
Background
The two existing coal-fired units of Guangdong Huizhou Pinghai power station, totaling 2,000 MW, were brought online in 2010 and 2011. The plant is owned by Guangdong Yudean Group.[1][2]
Description of Expansion
Guangdong Huizhou Pinghai power station is designed for a capacity of 6*1000MW. After the first phase 2000MW went operation, Guangdong Yudean Group was planning to build two additional coal-fired units at this plant, with a total planned capacity of 2,000 MW.[3]
However, there appear to be no developments on the new units since 2012, and they are likely abandoned.
2016: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
Fuel Source
The power station receives coal from the nearby Pinghai Electricity Plant Integrated Coal Terminal at Huizhou Port.[4][5]
CDM Controversy
Project developers applied for the station to be covered under the UN's Clean Development Mechanism. The project was to install and operate two ultra-supercritical coal-fired power generation units with the total capacity of 2×1000MW, to generate and sell electricity to the South China Power Grid (SCPG), which covers Guangdong, Guangxi, Yunnan, and Guizhou Provinces.[6]
The Sierra Club and other groups opposed the station's inclusion under the CDM, arguing that the project was already completed: Unit 1 of the project has been operational since October 2010,1 and Unit 2 was brought online in July 2011: "The fact that the project sponsors fully financed and completed the project in advance of CDM validation or registration proofs that the project developers did not need CDM support to move forward using ultra-supercritical technology."[7]
In late February 2012, the CDM executive board refused to register the Guangdong Pinghai project in China, which means that it will not be eligible for CDM support.
Articles and Resources
References
- ↑ "广东惠州平海发电厂有限公司"Guangdong Yudean Group, 2016-6-7
- ↑ "平海电厂二号机组投产 为广东最大火力电厂", 大洋网, 2011-01-27
- ↑ Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
- ↑ "Terminal, Breakwater and Supporting Marine Works of #1 and #2 Units (2×1000MW) of Guangdong Pinghai Power Plant," CCCC-FHDI Engineering, 2014-05-13
- ↑ "惠州小渔港成南方大港 20年已有万吨级泊位18个_今日惠州网". huizhou.cn. Retrieved 21 May 2015.
- ↑ "Project 4785 : Guangdong Pinghai Power Plant Phase I Project," UNFCCC, 01 Jul 11 - 30 Jun 21.
- ↑ "Review of the Additionality of the CDM Project 4785: Guangdong Pinghai Power Plant, China," UNFCCC, Aug. 2, 2011.