Guangdong Shanwei Haifeng power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Guangdong Shanwei Haifeng power station (汕尾海丰天然气热电联产保障电源项目一期 (Unit 1-1 and Unit 1-2)), 汕尾海丰天然气热电联产保障电源项目二期 (Unit 2-1 and Unit 2-2))) is a power station in Gongping Town, Haifeng County, Shanwei, Guangdong, China with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guangdong Shanwei Haifeng power station Gongping Town, Haifeng County, Shanwei, Guangdong, China 23.058436, 115.399182 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Pre-construction[2][3] fossil gas: natural gas[1][4] 460[4] combined cycle[4] yes[1][4] 2025 (planned)[4]
1-2 Pre-construction[2][3] fossil gas: natural gas[1][4] 460[2] combined cycle[1][4] yes[1][4] 2025 (planned)[4]
2-1 Announced[1][5] fossil gas: natural gas[1][5] 115[5] gas turbine[5] not found[5]
2-2 Announced[1][5] fossil gas: natural gas[1] 115[5] gas turbine[5] not found[5]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Guangdong Energy Group Co Ltd [100%][1] Guangdong Hengjian Investment Holding Co Ltd [76.0%]; China Huaneng Group Co Ltd [24.0%]
1-2 Guangdong Energy Group Co Ltd [100%][1] Guangdong Hengjian Investment Holding Co Ltd [76.0%]; China Huaneng Group Co Ltd [24.0%]
2-1 Guangdong Energy Group Co Ltd [100%][1] Guangdong Hengjian Investment Holding Co Ltd [76.0%]; China Huaneng Group Co Ltd [24.0%]
2-2 Guangdong Energy Group Co Ltd [100%][1] Guangdong Hengjian Investment Holding Co Ltd [76.0%]; China Huaneng Group Co Ltd [24.0%]

Background

The Phase 1 project (Unit 1-1 and Unit 1-2) is scheduled to commence construction in November 2023, with the first unit's operation expected in June 2025, and the second unit's operation in September 2025.[6]

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 http://www.swsm.net/forum.php?mobile=no&mod=viewthread&tid=624406. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 "汕尾市民网-汕尾海丰天然气热电联产保障电源项目 社会稳定风险评估公众参与公告". www.swsm.net. 2023-02-03. Archived from the original on 2024-05-07. Retrieved 2024-05-03.
  3. 3.0 3.1 "汕尾市人民政府办公室关于印发汕尾市贯彻落实《广东省扩大内需战略实施方案》的工作方案的通知_其他_汕尾市人民政府门户网站". www.shanwei.gov.cn. 2024-03-28. Archived from the original on 2024-05-07. Retrieved 2024-05-03.
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 "汕尾市2023年重点建设项目计划表" (PDF). Archived from the original (PDF) on 2024-05-07. Retrieved 2024-05-03.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 "广东省2022年重点建设项目计划表" (PDF). Archived from the original (PDF) on 2024-05-08. Retrieved 2024-04-26.
  6. "汕尾海丰天然气热电联产保障电源项目社会稳定风险评估公众参与公告". 2023-02-03. Retrieved 2023-10-26.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.