Guanghai Bay power station (广海湾经济开发区分布式能源站项目, 广海湾天然气热电联产项目一期 (Unit 1), 广海湾天然气热电联产项目一期 (Unit 2), 广海湾天然气热电联产项目二期 (Unit 3), 广海湾天然气热电联产项目二期 (Unit 4)) is a power station in Jiangmen, Chixi Town, Taishan, Guangdong, China with multiple units of varying statuses none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guanghai Bay power station Jiangmen, Chixi Town, Taishan, Guangdong, China 21.991586, 112.9895 (approximate)[1][2]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 pre-permit[3][4] fossil gas - LNG[5][4] 650[4][6] combined cycle[7] 2025[3]
Unit 2 pre-permit[7][4] fossil gas - LNG[5][4] 650[3][4] combined cycle[3][7] 2025[3]
Unit 3 announced[3][7] fossil gas - LNG[3] 800[3] combined cycle[3]
Unit 4 announced[3][7] fossil gas - LNG[3] 800[3][7] combined cycle[3][7]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Guangdong Yudean Xinhui Power Generation Co Ltd [100.0%]
Unit 2 Guangdong Yudean Xinhui Power Generation Co Ltd [100.0%]
Unit 3 Guangdong Yudean Xinhui Power Generation Co Ltd [100.0%]
Unit 4 Guangdong Yudean Xinhui Power Generation Co Ltd [100.0%]

Background

Guanghai Bay power station (广海湾天然气热电联产项目) plans to build four sets of 9H-class gas-steam combined cycle cogeneration units. The first phase of the project (Units 1 and 2) is scheduled to commence construction in December 2023 and start commercial operation in January 2025.[8]

Articles and Resources

References

  1. https://web.archive.org/web/20220415172257/http://www.hlfdw.com/plus/view.php?aid=829462. Archived from the original on 15 April 2022. {{cite web}}: Missing or empty |title= (help)
  2. "广东能源集团台山广海湾天然气热电联产项目-工程招标-拟在建-中国招标与采购网". www.zbytb.com. 2021-11-03. Retrieved 2024-04-30.
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 (PDF) http://www.cnts.gov.cn/attachment/0/266/266706/2855314.pdf. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 (PDF) https://web.archive.org/web/20220708194912/http://www.jiangmen.gov.cn/attachment/0/212/212142/2502172.pdf. Archived from the original (PDF) on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20230516214049/https://www.jiangmen.gov.cn/newzwgk/ghjh/zxgh/content/post_2502172.html. Archived from the original on 16 May 2023. {{cite web}}: Missing or empty |title= (help)
  6. "《江门市能源发展"十四五"规划》三年行动计划重点项目清单" (PDF). Retrieved 2024-04-30.
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 https://web.archive.org/web/20221004182649/https://www.bidcenter.com.cn/njrl/riliNjdateils-3-1311464.html. Archived from the original on 04 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. "广海湾临港经济区(首期)产业发展规划(2022-2030年)环境影响报告书" (PDF). 2023-05. Retrieved 2023-10-26. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.