Guangxi Chiji Iron and Steel Co., Ltd. Gas Power Project (广西翅冀钢铁有限公司2×100MW超高温亚临界煤气发电, 广西翅冀钢铁有限公司2×80MW超高温亚临界煤气发电, 广西翅冀钢铁发电项目) is an operating power station of at least 180-megawatts (MW) in Tangbu Town, Teng County, Wuzhou, Guangxi, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Guangxi Chiji Iron and Steel Co., Ltd. Gas Power Project | Tangbu Town, Teng County, Wuzhou, Guangxi, China | 23.369089, 111.164847 (exact)[1][2] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, 3, 4: 23.369089, 111.164847
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Construction[3] | industrial by-product: blast furnace gas[4] | 100[4] | steam turbine[3] | not found | – |
2 | Operating[1] | industrial by-product: blast furnace gas[4] | 100[4] | steam turbine[1] | not found | 2023[1] |
3 | Operating[3] | industrial by-product: blast furnace gas[4] | 80[4] | steam turbine[3] | not found | 2023[3] |
4 | Construction[5] | industrial by-product: blast furnace gas[4] | 80[4] | steam turbine[3] | not found | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Guangxi Chiji Iron and Steel Co Ltd [100%][1] | Qian'an City Jiujiang Wire Co Ltd [100.0%] |
2 | Guangxi Chiji Iron and Steel Co Ltd [100%][1] | Qian'an City Jiujiang Wire Co Ltd [100.0%] |
3 | Guangxi Chiji Iron and Steel Co Ltd [100%][1] | Qian'an City Jiujiang Wire Co Ltd [100.0%] |
4 | Guangxi Chiji Iron and Steel Co Ltd [100%][1] | Qian'an City Jiujiang Wire Co Ltd [100.0%] |
Project-level captive use details
Background
Unit 2 successfully achieved grid connection on February 21, 2023. [6]
Unit 3 began generating power through grid connection in March 2023.[7]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.eaeacn.com/hbgj/html/xwzx/31251.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240510201832/https://myjob500.com/JobFair/JobFairCompany?jobFairCompanyId=848d6adf-020d-4a60-8f90-5f05f1c4741e. Archived from the original on 10 May 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://www.sohu.com/a/665726373_121123524.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://pdf.dfcfw.com/pdf/H2_AN202007021388902941_1.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://www.ccepc.com/news_project/1517.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "广西翅冀2号机组一次并网成功". 2023-02-21. Retrieved 2023-11-07.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "一次并网 "电"力十足!". 2023-04-11. Retrieved 2023-11-07.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.