Guangxi Chiji Iron and Steel Co., Ltd. Gas Power Project

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Guangxi Chiji Iron and Steel Co., Ltd. Gas Power Project (广西翅冀钢铁有限公司2×100MW超高温亚临界煤气发电, 广西翅冀钢铁有限公司2×80MW超高温亚临界煤气发电, 广西翅冀钢铁发电项目) is an operating power station of at least 180-megawatts (MW) in Tangbu Town, Teng County, Wuzhou, Guangxi, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guangxi Chiji Iron and Steel Co., Ltd. Gas Power Project Tangbu Town, Teng County, Wuzhou, Guangxi, China 23.369089, 111.164847 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2, 3, 4: 23.369089, 111.164847

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Construction[3] industrial by-product: blast furnace gas[4] 100[4] steam turbine[3] not found
2 Operating[1] industrial by-product: blast furnace gas[4] 100[4] steam turbine[1] not found 2023[1]
3 Operating[3] industrial by-product: blast furnace gas[4] 80[4] steam turbine[3] not found 2023[3]
4 Construction[5] industrial by-product: blast furnace gas[4] 80[4] steam turbine[3] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Guangxi Chiji Iron and Steel Co Ltd [100%][1] Qian'an City Jiujiang Wire Co Ltd [100.0%]
2 Guangxi Chiji Iron and Steel Co Ltd [100%][1] Qian'an City Jiujiang Wire Co Ltd [100.0%]
3 Guangxi Chiji Iron and Steel Co Ltd [100%][1] Qian'an City Jiujiang Wire Co Ltd [100.0%]
4 Guangxi Chiji Iron and Steel Co Ltd [100%][1] Qian'an City Jiujiang Wire Co Ltd [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[3]
  • Captive industry: Iron & Steel[3]


Background

Unit 2 successfully achieved grid connection on February 21, 2023. [6]

Unit 3 began generating power through grid connection in March 2023.[7]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.eaeacn.com/hbgj/html/xwzx/31251.html. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240510201832/https://myjob500.com/JobFair/JobFairCompany?jobFairCompanyId=848d6adf-020d-4a60-8f90-5f05f1c4741e. Archived from the original on 10 May 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://www.sohu.com/a/665726373_121123524. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://pdf.dfcfw.com/pdf/H2_AN202007021388902941_1.pdf. {{cite web}}: Missing or empty |title= (help)
  5. http://www.ccepc.com/news_project/1517.html. {{cite web}}: Missing or empty |title= (help)
  6. "广西翅冀2号机组一次并网成功". 2023-02-21. Retrieved 2023-11-07.{{cite web}}: CS1 maint: url-status (link)
  7. "一次并网 "电"力十足!". 2023-04-11. Retrieved 2023-11-07.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.