Guangzhou (Meizhou) Industrial Transfer Industrial Park Distributed power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Guangzhou (Meizhou) Industrial Transfer Industrial Park Distributed power station (广州(梅州)产业转移工业园分布式综合能源站项目) is an announced power station in Meixian District, Meizhou, Guangdong, China. It is also known as 广梅产业园天然气分布式能源站项目, Guangmei Industrial Transfer Industrial Park Distributed power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guangzhou (Meizhou) Industrial Transfer Industrial Park Distributed power station Meixian District, Meizhou, Guangdong, China 24.029692, 115.996678 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
1 Announced[2][1] fossil gas: natural gas[1] 50[1][3] combined cycle[1] yes[1][3]
2 Announced[2][1] fossil gas: natural gas[1][3] 50[3] combined cycle[1][3] yes[1][3]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name
1
2

Background

In April 2021, The Meizhou Municipal People's Government has issued the 14th Five-Year Plan and the 2035 Visionary Objectives Outline for Meizhou's National Economic and Social Development, which includes plans to promote this project. [4]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://archive.org/details/2021-2025_202405/page/n5/mode/2up. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20220614195407/https://www.meizhou.gov.cn/zwgk/fggw/sfbgswj/content/post_2286817.html. Archived from the original on 14 June 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://archive.org/details/20231027_20231027_0118. {{cite web}}: Missing or empty |title= (help)
  4. "梅州市人民政府关于印发梅州市国民经济和社会发展第十四个五年规划和二〇三五年远景目标纲要的通知". 2021-04-15. Retrieved 2023-10-27.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.