Guangzhou Baiyun Hengyun power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Guangzhou Baiyun Hengyun power station (白云2×460MW级天然气发电项目, 广州白云恒运天然气发电项目一期 (Unit 1-1, 1-2)), 广州白云恒运天然气发电项目二期 (Unit 2-1)) is a power station in Dalang Village, Baiyun District, Guangzhou, Guangdong, China with multiple units of varying statuses, none of which are currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Guangzhou Baiyun Hengyun power station | Dalang Village, Baiyun District, Guangzhou, Guangdong, China | 23.2517508, 113.2399112 (exact)[1][2] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1-1, 1-2, 2-1: 23.2517508, 113.2399112
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1-1 | Construction[3][4] | fossil gas: natural gas[5] | 460[5] | combined cycle[5] | not found | 2025 (planned)[4] |
1-2 | Construction[3][4] | fossil gas: natural gas[5] | 460[5] | combined cycle[5] | not found | 2025 (planned)[4] |
2-1 | Announced[5] | fossil gas: natural gas[5] | 460[5] | combined cycle[5] | yes[5] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1-1 | Guangzhou Hengyun Enterprise Group Co Ltd [100%][6][4] | Guangzhou Hengyun Enterprise Group Co Ltd [100.0%] |
1-2 | Guangzhou Hengyun Enterprise Group Co Ltd [100%][6][4] | Guangzhou Hengyun Enterprise Group Co Ltd [100.0%] |
2-1 | Guangzhou Hengyun Enterprise Group Co Ltd [100%][5][4] | Guangzhou Hengyun Enterprise Group Co Ltd [100.0%] |
Background
Guangzhou Baiyun Hengyun power station (广州白云恒运天然气发电项目) plans for three 460MW-class gas-steam combined cycle generating units. [7]The first phase aims to construct two 460MW-class gas-steam combined cycle peaking units, with construction commencing in June 2023 and an expected operation start in 2025.[8]
Articles and Resources
References
- ↑ https://www.by.gov.cn/gzjg/byhj/zwgk/zfxxgkml/qt/qt/content/post_8915213.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://m.bjx.com.cn/mnews/20240508/1375469.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "广州白云恒运天然气发电项目存多项问题,施工及监理单位均被公示_手机网易网". www.163.com. 2024-03-31. Archived from the original on 2024-05-06. Retrieved 2024-04-23.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://www.seetao.com/details/218497.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 https://web.archive.org/web/20230331024210/https://freewechat.com/a/MzA5MjgwNjEyMw==/2650745808/1.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20220414231441/http://www.hengyun.com.cn/EnvironmentalWork/info.aspx?itemid=7484. Archived from the original on 2022-04-14.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "2×460MW!穗恒运A拟投建广州白云恒运天然气发电项目". 2023-02-06. Retrieved 2023-10-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "广州白云天然气发电项目2×460MW级燃气机组工程开工". 2023-06-22. Retrieved 2023-10-27.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.